19
8.
Installation of the Air Hoist
①
Hang the hoist up with pointed part as below diagram. (Hole diameter 27mm)
②
Install the upper hook to the supporting beam.
WARNING
;
Make sure the upper hook is assembled correctly.
・
Make sure the upper hook is assembled to the recommended material and also make sure the
hook safety claw is securely locked.
③
Apply seal tape to the hose nipple, and assemble to the Air Hoist.
④
Stop the air flow by closing the main valve on the compressor.
⑤
Before connecting the air line to the air hoist, apply 20 drops of lubricating oil into the hose.
IMPORTANT
;
Remove all dirt or foreign matter from the connecting area
of the hose.
・
If foreign matter enters the hoist, this may lead to seizure of the hoist or malfunctioning.
⑥
Assemble the hose stem and nut securely to the hose using the hose band.
(
Please note the hose band is not an accessory item
)
Air & Allied Sales (Pacific) Pty Ltd
www.air-allied.com.au