Model: TTT-710
8.4 Waste Solution Flow Passage Maintenance and Inspection
- 95 -
(e) Check that the waste solution tank liquid level sensor operates normally.
•
Liquid level sensor performance check method
⋅⋅⋅
>>
6.1 (4) “Pumps and waste water valve
operation and tank liquid level judgment”
(2) Waste solution hose replacement
After performing 8.4(1) “Waste solution flow passage inspection”, replace the waste solution hoses,
as required.
①
Set the power switch to OFF.
⋅⋅⋅⋅⋅⋅
Set the power switch at the left-hand side of the product to
OFF.
②
Remove the piping cover.
⋅⋅⋅⋅⋅⋅
Remove the piping cover on the front (left-hand side) of the
product.
③
Remove the old hose.
⋅⋅⋅⋅⋅⋅
Of waste solution hose (for outlet 1), waste solution hose (for
overflow port), and waste solution hose (for outlet 2), remove the hose that requires replacement.
Waste Solution Hose Replacement
④
Replace the hose.
⋅⋅⋅⋅⋅⋅
Cut the new waste solution hose to match the length of the old waste
solution hose (for outlet 1, for outlet 2, and for overflow) removed at step
③
and install it as it
was originally.
•
Part code: for outlet 1: 116E028, for outlet 2: XD701500, for overflow: 116E030)
>>
4.3(3) “Waste solution tank connection”
⑤
Return to original state.
⋅⋅⋅⋅⋅⋅
Install the piping cover on the front (left-hand side) of the product
as it was originally and set the power switch to ON.
Содержание TTT-710
Страница 115: ... 114 ...
Страница 117: ... 116 ...