W W W . T M G I N D U S T R I A L . C O M
P 0 8 / 3 7
T o l l F r e e : 1 - 8 7 7 - 7 6 1 - 2 8 1 9
3 Installation and commissioning instructions
3.1 Installation Preparation
3.1.1 Installation location
The installation location of the machine must be in line with the standard of the
installation
work.
The tire changer need to be installed in the main power supply and compressed air
system.
Equipment installation location should be at least up to the standard shown in Figure
4 and 4-a, which can ensure the normal operation and the machine parts are not
subject to any restrictions.The tire changer is forbidden to use in explosive gas.
Figure4
Figure4-a