5
3-UNPACKING & SETUP
Only skilled personnel who are familiar with the lift and this manual shall be allowed to
carry out, lifting, handling, transport and unpacking operations.
When the lift is delivered, carefully unpack the lift making sure all the parts have been
included. Check for possible damages due to transport and storage; verify that what
is specified in the confirmation of order is included. In case of damage in transit, the
customer must immediately inform the carrier of the problem�
Remove the lift and all parts from delivery pallet and place on a clean, solid, flat surface.
Packages must be opened paying attention not to cause damage to people (keep a safe
distance when opening straps) and parts of the lift (be careful the objects do not drop from
the package when opening.)
LIFT AND HANDLE ONLY ONE PACKAGE AT A TIME
3.1 DELIVERY AND CHECK OF PACKAGES
3.2 LIFTING AND HANDLING
3.3 PREPARATION
When loading/unloading or transporting the equipment to the site, be sure to use suitable
loading (e.g. cranes, trucks) and hoisting means. Be sure to hoist and transport the
components securely so that they cannot drop, taking into consideration the package’s
size, weight, center of gravity, and its fragile parts.
The installation of this lift is relatively simple and can be accomplished by 2 men in a few
hours. The following tools and equipment are needed:
1�
ISO-32, AW-32, or AW-46 hydraulic oil (2.5 Gallons)
2� Chalk line and Tape Measure
3�
Rotary Hammer Drill with 3/4” Drill Bit. Core Drill Rebar Cutter recommended
4� 4’ Level
5�
Sockets and Open Wrench set, 1/2” thru 1-1/2”(1-1/8”for 3/4” Anchors)
6� Pliers
7�
Torque Wrench
8�
Metric allen wrench set
Содержание HD2P-9000AF
Страница 24: ...20 FIG 1 9000AF 110 3 8 134 5 8 111 1 4 112 MAX 72 3 4 MIN 4 5 8 6 7 8 11 DIAGRAMS FIG 1 3...
Страница 25: ...21 FIG 2 9000AF 134 5 8 R 34 72 R 28 54 R 40 75 R 52 44 17 91...
Страница 26: ...22 FIG 3 9000AF Bottom Cable Sheave Top Cable Sheave Equalizing Cable 2 Carriage Locking Nuts 4...
Страница 27: ...23...
Страница 28: ...24 FIG 4 9000AF 12 PARTS FIG 4 5...
Страница 29: ...25 FIG 4B 9000AF...
Страница 34: ......