background image

7

5.3 IMPORTANT CONCRETE AND ANCHORING INFORMATION

1� 

Concrete shall have compression strength of at least 3,000 PSI and a minimum 

thickness of 4”. Measure the length of the supplied anchor bolts in order to achieve a 

minimum anchor embedment of 3-1/4”. If the top of the anchor exceeds 2” above the 

floor grade, you DO NOT have enough embedment.

2� 

Before drilling 3/4” dia. Holes in concrete floor using holes in column base plate as 

guide, make sure the hole distance from the edge is not less than 6”. Hole to hole 

spacing should not be less than 6 1/2 in any direction. Concrete thickness should be a 

minimum of 4”

DANGER:

 DO NOT Install on asphalt or other similar unstable surface� Columns are 

supported only by anchoring in floor.

3�  Shim each column base until each column is plumb� If one column has to be elevated 

to match the plane of the other column, full size base shim plates should be used 

(Reference Shim Kit). Torque anchors to 85 ft-lbs. Shim thickness MUST NOT exceed 

1/2”. Adjust the column extensions plumb.

4� 

If anchors do not tighten to 85 ft-lbs. installation torque, replace concrete under each 

column base with a 4’ x 4’ x 6” thick 3,000 PSI minimum concrete pad keyed under and 

flush with the top of existing floor. Let concrete cure at least 30 days before installing 

lifts and anchors�

5.4 ANCHORING TIP SHEET

1� 

Use a concrete hammer drill with a carbide tip, solid drill bit the same diameter as the 

anchor, 3/4”. (.775 to .787 inches diameter). Do not use excessively worn bits or bits 

which have been incorrectly sharpened.

2� 

Keep the drill perpendicular to the concrete while drilling.

3� 

Let the drill do the work. Do not apply excessive pressure. Lift the drill up and down 

occasionally to remove residue to reduce binding.

4� 

Drill the hole for anchor bolt completely through the concrete. If an error is made during 

the installation of these anchors, this will allow for the anchor bolt to be driven down 

into the ground, so that a new anchor may be installed in place (fig.1).

5� 

Be sure to clean all dust from hole. (fig. 2).

Содержание HD2P-9000AF

Страница 1: ...CHINE WILL FUNCTION CORRECTLY AND PROVIDE MANY YEARS OF DEPENDABLE SERVICE FAILURE TO FOLLOW THESE INSTRUCTIONS AND SAFETY WARNINGS MAY RESULT IN PERSONAL INJURY OR PROPERTY DAMAGE KEEP THIS MANUAL IN...

Страница 2: ...Products May Be Upgraded Without Notice Please Visit WWW TITANLIFTS COM For The Latest Version Of This Manual P O Box 7069 Greenwood IN 46142 Ph 888 908 4826 Fx 317 215 2770 www titanlifts com...

Страница 3: ...SHEET PAGE 7 6 INSTALLATION INSTRUCTIONS PAGE 8 7 OPERATION INSTRUCTIONS PAGE 11 7 1 DEFECTS MALFUNCTIONS PAGE 11 7 2 CONTROLS PAGE 11 7 2 1 UP CONTROL PAGE 11 7 2 2 SAFETY LOCK CONTROL PAGE 11 7 2 3...

Страница 4: ...distance Titan Lifts or its representatives must approve the pictures before anything can be moved D If any potential liability is determined on behalf of Titan Lifts two estimates must be submitted...

Страница 5: ...mmended Always lift the vehicle using all four arms Never use the lift to raise one end or one side of vehicle FAILURE TO COMPLY WITH INSTRUCTIONS COULD RESULT IN PROPERTY DAMAGE WARNING READ ENTIRE M...

Страница 6: ...nd sufficiently lit Vehicle doors should be closed during the raising and lowering cycles Closely watch the vehicle and lift during the raising and lowering cycles Do not operate the lift in explosive...

Страница 7: ...ehicle is improperly placed on the platforms when the vehicle s weight or physical dimensions exceed the rated capacity of the lift or when there is excessive movement of the vehicle while on the lift...

Страница 8: ...this manual before operating the lift Proper installation is very important To minimize the chance of making an error in installation please read this manual thoroughly before beginning installation...

Страница 9: ...careful the objects do not drop from the package when opening LIFT AND HANDLE ONLY ONE PACKAGE AT A TIME 3 1 DELIVERY AND CHECK OF PACKAGES 3 2 LIFTING AND HANDLING 3 3 PREPARATION When loading unloa...

Страница 10: ...that adequate space and height is available 2 Check for ceiling clearance lifting height plus vehicle height 3 Check for clearance in front and rear of vehicle on lift 4 Check for overhead garage doo...

Страница 11: ...it Torque anchors to 85 ft lbs Shim thickness MUST NOT exceed 1 2 Adjust the column extensions plumb 4 If anchors do not tighten to 85 ft lbs installation torque replace concrete under each column bas...

Страница 12: ...earance in this location NOTE the power unit column can be located on either side 5 Position the columns facing each other 134 5 8 to outside base plates NOTE The power unit column is referred to as t...

Страница 13: ...loor plate as shown in Fig 4 13 Mount the power unit on lift as shown in Fig 4 14 Install the swing arms on the carriages using the included 1 1 2 diameter pins Also install the arm restraint pins at...

Страница 14: ...irst WARNING DO NOT PERFORM ANY MAINTENANCE OR INSTALLATION OF ANY COMPONENTS WITHOUT FIRST ENSURING THAT ELECTRICAL POWER HAS BEEN DISCONNECTED AT THE SOURCE OR PANEL AND CANNOT BE REENERGIZED UNTIL...

Страница 15: ...SUCH AS JERKY LIFT MOVEMENT OR DEFORMATION OF THE SUPERSTRUCTURE SUPPORT OR LOWER THE LIFT IMMEDIATELY CONTACT QUALIFIED SERVICE PERSONNEL WARNING PAY CLOSE ATTENTION WHEN SETTING THE LOCKS THE LOCKS...

Страница 16: ...ad the vehicles owner s manual to identify the recommended vehicle lifting points 12 Prepare the work area according to this manual Move the lifting arms inward and position the rubber pads to contact...

Страница 17: ...safety locks 17 Once the repair work to the vehicle is complete make sure to remove all tools safety jack stands and materials from under the vehicle and lift Also make sure the work area is clear and...

Страница 18: ...or torn 5 Check hydraulic connections and hoses for leakage 6 Check chain connections Bends cracks and looseness 7 Check for frayed cables in both raised and lowered positions 8 Check snap rings at a...

Страница 19: ...operating in harsh or dusty conditions a shorter interval may be required THE FOLLOWING ITEMS SHOULD ONLY BE PERFORMED BY A TRAINED MAINTENANCE EXPERT Replace hydraulic hoses Replace chains and roller...

Страница 20: ...ightness before each use to ensure proper working condition 3 Lightly oil the cylinder rods at least once every six months or when they become dry IMPORTANT AFTER CLEANING WORKSHOP FLOOR OR LIFT TO MA...

Страница 21: ...ety lock is audibly and visibly operating correctly 4 Check the floor for stress cracks near the anchor bolts 1 Every six months check the nuts of all bolts for correct installation torque 2 Retighten...

Страница 22: ...or hums and will not run A Impeller fan cover is dented Take off and straighten B Faulty wiring Call electrician C Bad capacitor Call electrician D Low voltage Call electrician E Lift overloaded Reduc...

Страница 23: ...of energy sources per ANSI Z244 1 1982 before beginning any lift repairs Shall not modify the lift in any manner without prior written consent of the manufacturer Shall display this manual or copy sup...

Страница 24: ...20 FIG 1 9000AF 110 3 8 134 5 8 111 1 4 112 MAX 72 3 4 MIN 4 5 8 6 7 8 11 DIAGRAMS FIG 1 3...

Страница 25: ...21 FIG 2 9000AF 134 5 8 R 34 72 R 28 54 R 40 75 R 52 44 17 91...

Страница 26: ...22 FIG 3 9000AF Bottom Cable Sheave Top Cable Sheave Equalizing Cable 2 Carriage Locking Nuts 4...

Страница 27: ...23...

Страница 28: ...24 FIG 4 9000AF 12 PARTS FIG 4 5...

Страница 29: ...25 FIG 4B 9000AF...

Страница 30: ...ner haxangular bolt 2 19 TPF4 300 09 Spring 2 20 GB6170 2000 M6 Hexangular nut 2 21 GB91 86 2 5X32 Shaft sheath 6 22 TPF4 300 02 Pull spring 2 23 TPF4 400 06 00 Pin jointing 4 24 TT 6934 200 02 Cover...

Страница 31: ...4 M14 Combination washer 7 52 TT 6934 500 04 Cylinder fitting 1 53 GB95 1985 D16 Flat washer 4 54 GB 6170 2000 M16 Hexangular nut 8 55 TPF4 Oil cylinder NEW Oil cylinder subassembly 2 56 TT 6934 500 0...

Страница 32: ...se fitting 1 3 Annectent spindle 1 4 Check valve 1 5 Lowering valve 1 6 Bolt 1 7 Throttle valve 1 8 Escape oil valve 1 9 Oil box 1 10 Suction oil hose 1 11 Gear pump 1 12 Bumper valve 1 13 Valve seat...

Страница 33: ...Titan Lifts product you must register your product with us The simplest way to do this is to visit TITANLIFTS COM WARRANTIES and submit your information online If you prefer to send your information...

Страница 34: ......

Страница 35: ...items such as but not limited to rubber wheel vise pads Titan Bulldog Moto Cradle Wheel Chock is warrantied for replacement parts only to the original purchaser for a period of 2 years from the date...

Страница 36: ...46142 1 888 908 4826 FAX 317 215 2770 www titanlifts com TITAN MARKETING LLC Copyright 2020 by Titan Marketing LLC All rights reserved No portion of this manual or any artwork contained herein may be...

Отзывы: