INSTALLATION, OPERATION
& MAINTENANCE MANUAL
FOLLOW THIS MANUAL CAREFULLY TO ENSURE THE MACHINE WILL
FUNCTION CORRECTLY AND PROVIDE MANY YEARS OF DEPENDABLE SERVICE.
FAILURE TO FOLLOW THESE INSTRUCTIONS AND SAFETY WARNINGS MAY
RESULT IN PERSONAL INJURY OR PROPERTY DAMAGE. KEEP THIS MANUAL IN A
SAFE DRY PLACE FOR FUTURE REFERENCE.
MODEL:
HD2P-9000AF
9,000 LB CAPACITY 2 POST LIFT
®
Содержание HD2P-9000AF
Страница 24: ...20 FIG 1 9000AF 110 3 8 134 5 8 111 1 4 112 MAX 72 3 4 MIN 4 5 8 6 7 8 11 DIAGRAMS FIG 1 3...
Страница 25: ...21 FIG 2 9000AF 134 5 8 R 34 72 R 28 54 R 40 75 R 52 44 17 91...
Страница 26: ...22 FIG 3 9000AF Bottom Cable Sheave Top Cable Sheave Equalizing Cable 2 Carriage Locking Nuts 4...
Страница 27: ...23...
Страница 28: ...24 FIG 4 9000AF 12 PARTS FIG 4 5...
Страница 29: ...25 FIG 4B 9000AF...
Страница 34: ......