background image

4-4

28009-09   09/16

VERSALIFT   SST-37/40-EIH

OPERA

TION

POWER LINES AND APPARATUS WILL CAUSE 

DEATH OR SERIOUS INJURY.

The accumulation of dirt and moisture on insulated 

booms degrades the insulation.  Be sure the booms 

are clean and dry.  Remember that the inside of a 

boom may be wet even when the outside is dry.  Any 

equipment which bridges between the platform and 

the ground voids the insulation and must be avoided 

when working near areas of electrical hazard.

DANGER:

 

EQUIPMENT WHICH BRIDGES 

BETWEEN THE PLATFORM AND GROUND 

RENDERS THE INSULATION USELESS AND MAY 

RESULT IN DEATH OR SERIOUS INJURY IN THE 

EVENT OF AN ELECTRIC SHOCK.

 

DANGER:

 

GIVE WARNING AND NEVER 

ALLOW ANYONE ON THE GROUND TO TOUCH 

THE UNIT WHEN THE LIFT IS BEING USED 

TO WORK ON OR NEAR ELECTRICAL LINES. 

IF THE UNIT BECOMES ENERGIZED DEATH 

OR SERIOUS INJURY WILL RESULT FROM 

CONTACT WITH THE UNIT.

DANGER:

 

CONTACT BETWEEN AN 

ELECTRICALLY CHARGED WIRE AND A METAL 

PART OF THE BOOM MAY CAUSE THE WIRE 

TO BURN THROUGH, LETTING THE TWO WIRE 

ENDS FALL TOWARD THE GROUND.  THIS 

WILL CAUSE DEATH OR SERIOUS INJURY TO 

INDIVIDUALS ON THE GROUND.

As previously stated, it is the responsibility of 

the operator and the ground crew to know and 

understand the capabilities and limitations of the 

aerial lift and hazards associated with operation near 

electric lines or components.  In addition they must 

apply this knowledge to situations that arise on the 

job for safe and efficient operation.  

CAB CONTROL OPERATION

The cab controls include the master control, the 

engine start/stop control, and the PTO shifter.  

MASTER CONTROL (Standard)  

- The master 

control consists of a toggle switch and a light  

mounted on the dashboard of the truck.  The toggle 

switch is used to energize or de-energize the start/

stop system and the throttle control options.  When 

the light is lit the toggle switch is energizing these 

systems.  

ENGINE START/STOP (Standard) 

- The engine 

start/stop is a push button control that is usually 

mounted on the dashboard of the truck.  The system 

is activated by pushing and holding the button 

momentarily to “start” the engine.  If the engine does 

not crank then the start/stop button may require a 

second push to get the latching relay into the “start” 

position so the truck engine will turn over.  Then to 

turn the engine off press the start/stop button again.  

This feature is especially convenient when the lift is 

being operated from the lower (turret) controls.

DANGER:

 

THE TRUCK TRANSMISSION 

MUST BE IN NEUTRAL OR PARK BEFORE 

USING THE ENGINE START/STOP.  STARTING 

THE ENGINE WITH THE TRUCK IN GEAR WILL 

CAUSE MOVEMENT WHICH MAY CAUSE DEATH 

OR SERIOUS INJURY TO THE OPERATOR OR 

ANYONE IN THE PATH OF THE TRUCK.

POWER-TAKE-OFF(PTO) (If So Equipped.)

 - The 

power-take-off is a gearbox used to transmit power 

from the truck transmission to the hydraulic pump, 

providing hydraulic oil for the aerial lift functions.  

The PTO control consists of a toggle switch and a 

red light mounted in the truck dashboard.  When the 

red (PTO) indicator is lighted the PTO is activated.  

The operator must never drive the truck with the 

PTO engaged.

CAUTION:

 

DRIVING WITH THE PTO 

ENGAGED MAY DAMAGE THE TRANSMISSION, 

PUMP, AND/OR THE PTO.

To engage the PTO properly refer to the operating 

instructions located in the PTO manufacturer’s 

owner manual.  If the PTO control is not responding 

properly or if the manufacturer’s operating decals 

are not posted in the cab (near the control) notify 

the appropriate personnel for correction.

GROUND CONTROL OPERATION

The Versalift ground controls may include one or 

more of the following controls: outrigger, outrigger/

boom interlock, and tool power.  Ground controls 

are usually mounted on panels in the rear bumper 

of the truck or below the deck.  Descriptions and 

Содержание Versalift SST-37-EIH

Страница 1: ...TIME MANUFACTURING CO DO NOT ATTEMPT TO OPERATE THIS VERSALIFT UNTIL YOU HAVE READ AND UNDERSTOOD ALL INFORMATION IN BOTH OPERATOR S AND SERVICE MANUALS PROVIDED WITH EACH VERSALIFT MANUAL PART NUMBER...

Страница 2: ......

Страница 3: ...Manufacturer s satisfaction to have been originally defective Correction of such defects by repair to or supplying of replacements for defective parts shall constitute fulfillment of all obligations...

Страница 4: ......

Страница 5: ...nd What is not Insulated 2 9 Additional Safety Considerations 2 10 Speci cations Section 3 General Speci cations 3 1 Option Speci cations 3 2 Dimensional Speci cations 3 5 Vehicle Speci cations 3 11 O...

Страница 6: ......

Страница 7: ...rsonnel at work stations above the ground This aerial device as manufactured meets or exceeds all applicableANSI A92 2 Full controls at the platform and complete freedom of boom movements make the Ver...

Страница 8: ...1 2 28009 09 09 16 VERSALIFT SST 37 40 EIH INTRODUCTION...

Страница 9: ...at can be protected against only by the exercise of INTELLIGENCE CARE AND COMMON SENSE It is essential to have COMPETENT CAREFUL PERSONNEL TRAINED in the INTENDED USE SAFE OPERATION MAINTENANCE AND SE...

Страница 10: ...of accidents is greatly dependent upon good judgement and common sense of the operator It is the responsibility of the operator to use the Versalift only when it has been installed and maintained in a...

Страница 11: ...2 3 28009 09 09 16 VERSALIFT SST 37 40 EIH RESPONSIBILITIES SAFETY...

Страница 12: ...2 4 28009 09 09 16 VERSALIFT SST 37 40 EIH RESPONSIBILITIES SAFETY...

Страница 13: ...2 5 28009 09 09 16 VERSALIFT SST 37 40 EIH RESPONSIBILITIES SAFETY...

Страница 14: ...ituations that might occur during the use or operation of the Versalift Some of these safety problems are very basic and as a result are often taken for granted Always engage the outriggers and mainta...

Страница 15: ...rs and another conductor Never allow anyone on the ground to touch the unit when the lift is being used to work on or near electrical lines Never use the VERSALIFT as a crane Stow the booms securely b...

Страница 16: ...RSALIFT SST 37 40 EIH RESPONSIBILITIES SAFETY Stand only on the platform oor Don t climb out of a raised platform onto poles etc Keep the fiberglass booms clean and dry Foreign substances on the booms...

Страница 17: ...rs hot sticks etc maintain safe approach distances and follow company work practices Area 2 Upper Boom Insulation Section This section provides insulation between the boom tip area and earth ground wh...

Страница 18: ...l force any trapped air out of the hydraulic system Donotoperatetheliftfromtheplatform until this process is completed Air trapped in the hydraulic oil can cause lift movements to be erratic and unpre...

Страница 19: ...boom assembly The hoses routed through the outer inner boom assembly are non conductive and fully contained within the boom assembly The outer inner boom assembly articulates from 14 below horizontal...

Страница 20: ...rical work at 46 KV and below in accordance with ANSI A92 2 requirements Aerial devices may be designed and con gured for gloving work and tool methods at 46KV and below The outer inner boom assembly...

Страница 21: ...tuates a pressure switch An additional pass in the collector assembly is usually required TWO SPEED MANUAL THROTTLE CONTROL This system provides for aerial lift operation at e cient economical engine...

Страница 22: ...testing The insert is tested per ANSI A92 2 CATEGORY D DIELECTRIC TESTING AND CERTIFICATION Testing and certification for ANSI A92 2 Category D are available These aerial devices which are designed a...

Страница 23: ...ure 2250 PSI 158 kg cm2 Flow Rate 3 GPM 11 lpm Filtration 10 micron return 100 mesh suction System Type Open center Boom Action Inner Boom 116 in 2 9 m Extension Outer Boom 14 to 74 Outer Boom With Gr...

Страница 24: ...3 6 28009 09 09 16 VERSALIFT SST 37 40 EIH SPECIFICATIONS SST 37 EIH Platform Travel...

Страница 25: ...3 7 28009 09 09 16 VERSALIFT SST 37 40 EIH SPECIFICATIONS...

Страница 26: ...System Operating Pressure 2250 PSI 158 kg cm2 Flow Rate 3 GPM 11 lpm Filtration 10 micron return 100 mesh suction System Type Open center Boom Action Inner Boom 116 in 2 9 m Extension Outer Boom 140 t...

Страница 27: ...3 9 28009 09 09 16 VERSALIFT SST 37 40 EIH SPECIFICATIONS SST 40 EIH Platform Travel...

Страница 28: ...3 10 28009 09 09 16 VERSALIFT SST 37 40 EIH SPECIFICATIONS...

Страница 29: ...60 kg 6 000 lbs 2720 kg Front 13 860 lbs 6287 kg 13 500 lbs 6120 kg Rear GM 4500 Chassis 450 lbs 400 lbs 17 500 lbs 7935 kg 13 100 lbs 5942 kg 204 kg 181 kg 6 000 lbs 2722 kg Front 13 500 lbs 6124 kg...

Страница 30: ...000 lbs 2722 kg Front 14 780 lbs 6704 kg 13 500 lbs 6124 kg Rear GM 4500 Chassis 450 lbs 400 lbs 17 500 lbs 7935 kg 13 100 lbs 5942 kg 204 kg 181 kg 6 000 lbs 2722 kg Front 13 500 lbs 6124 kg Rear Wi...

Страница 31: ...3 13 28009 09 09 16 VERSALIFT SST 37 40 EIH SPECIFICATIONS...

Страница 32: ...3 14 28009 09 09 16 VERSALIFT SST 37 40 EIH SPECIFICATIONS...

Страница 33: ...d with outriggers On units with outriggers aerial device must be leveled within 2 of horizontal OPERATION prior to operation Refer to slope indicators provided on the chassis to show whether the aeria...

Страница 34: ...Start Up Procedures When Operating From the Ground Position the truck as described in this section In extremely cold weather allow the aerial lift to idle a few minutes before engaging a load Further...

Страница 35: ...l Operation in this section Operating Where Electrical Hazards Are Present It is imperative that the aerial device operator understand the dangers associated with operating near electrical hazards Due...

Страница 36: ...m and the throttle control options When the light is lit the toggle switch is energizing these systems ENGINE START STOP Standard The engine start stop is a push button control that is usually mounted...

Страница 37: ...gers select ground controls with the control selector Then operate the outriggers as described previously Select lift controls with the control selector in order to begin operating the booms Retractin...

Страница 38: ...the outer boom inner boom rotation and lower boom PLATFORM LEVELING CONTROL Optional This control activates the hydraulic platform leveling to stow unstow or level the platform Hand Held Remote Lower...

Страница 39: ...erator to control all lift movements Lift operations are selected by depressing the safety trigger while actuating the single stick control handle Slowly move the single stick lever in the desired dir...

Страница 40: ...tools Push and release the throttle control to increase the engine speed Push and release again to return to idle EMERGENCY LOWERING Optional If the aerial lift s main power source fails the emergency...

Страница 41: ...the outriggers if so equipped and fully retract the inner boom when using the boom lifting eye Boom movements should be smooth to avoid swinging the load Do not exceed the load limits stated on the d...

Страница 42: ......

Страница 43: ...he booms can be lowered using the set screw on the holding valve located at the cylinders The boom will drift down as the hydraulic oil passes through the holding valve The speed of the boom s descent...

Страница 44: ...ity leveled lift DANGER THE TRUCK TRANSMISSION MUST BE IN NEUTRAL OR PARK BEFORE USING THE ENGINE START STOP STARTING THE TRUCK IN GEAR WILL CAUSE MOVEMENT WHICH MAY CAUSE DEATH OR SERIOUS INJURY TO T...

Страница 45: ...ial lift to conserve the hydraulic oil If operation of any aerial lift function is not possible then use the holding valve set screw and the manual rotation procedure described earlier in this chapter...

Страница 46: ......

Страница 47: ...s designed to provide years of reliable service with minimum maintenance A routine preventive maintenance program will assure extended aerial lift service The operator is responsible for detecting mai...

Страница 48: ...be cleaned daily with a lint free cloth If the berglass sections require a more thorough cleaning refer to Service Procedure Section Care of Fiberglass Booms of the SST 37 40 EIH Service and Installat...

Страница 49: ...ection in this section for complete description of checks Additional copies of this form may be obtained from Time Manufacturing Company DAY SUN MON TUE WED THU FRI SAT DATE INSPECT BOOMS FOR TRASH DE...

Страница 50: ...6 4 28009 09 09 16 VERSALIFT SST 37 40 EIH DAILY VISUAL INSPECTION...

Страница 51: ...6 5 28009 09 09 16 VERSALIFT SST 37 40 EIH DAILY VISUAL INSPECTION...

Отзывы: