background image

TIE DOWN

 Safety Products Division

800-241-1806   •  404-344-0000  •  www.tiedown.com

Page 6 of 8

Quick Set Base

Set Up Instructions

Assembly and Mounting

1. Place all Quick Set bases around the leading edge of the fall hazard area, space the Quick Set bases  at  
  approximate lengths of the corresponding length of guardrail (10’, 7.5’ and 5’).

2. When assembling the guardrails into the Quick Set, position the guardrails between the fall hazard and the  
  installers work area. Position one leg of each guardrail into the outermost Quick Set retaining tube.    
  Maintaining the guardrail positions between the installers body and the fall hazard edge, position the tube  
  into the adjacent Quick Set retaining tube.

3. Once each guardrail tube has been inserted into the Quick Set retaining tube, install the retaining pins.

Single Screw Attachment

Must be attached through

the center slot

Multi Screw Attachment

Additional screws may be

added for additional security

Securing the Base

Quick Set base plates are only approved for concrete substrates with a minimum slab thickness of 6 inches with a 
minimum concrete strength of  3,000 psi, normal weight, (cracked) concrete.

Screw should be 3.5 inches in length. 0.5 inches in diameter.

Rated for 1000 pounds of pull out force in substrate used.

1. Using the Quick Set plate as a guide: first drill a 1/2”x 4” hole using a carbide-tipped masonry bit. The quickest, 
easiest way to drill into concrete is with a hammer drill. It’s also important to blow or vacuum the concrete dust 
from the hole before inserting the fastener. Fasteners grip much more tightly to clean, dust-free holes. 

2. Follow installation instructions supplied with the type fastener you are using. 

6” Min.

4” Deep

Содержание Juggernaut

Страница 1: ...Instruction 08342 E1739 Rev 6 22 20 Online Manual Safety Products Division 605 Stonehill Drive SW Atlanta Georgia 30336 800 241 1806 404 344 0000 www tiedown com Juggernaut and Guardrail Instructions...

Страница 2: ...Base 70756 Safety Strap 13814 Hoisting Ring Forklift Pockets Forklift Pockets 3 Triangular Hook Points 3 Triangular Hook Points Hoisting Ring Loading The Juggernaut Cart RZ Bases should be centered a...

Страница 3: ...guardrails must be secured with Pull Straps Secure bases with the pull strap by placing it over and in between the base guide post Secure the guardrails by attaching the pull straps over the mid rail...

Страница 4: ...he square mounting holes Install onto the frame as shown right using the carriage bolts and nuts provided Tighten the carriage bolts and nuts attached to the frame Next tighten the 4 nuts and bolts fo...

Страница 5: ...ation has a curb or parapet edge the Quick Set Base can be placed perpendicular against the rise of the structure 4 Always be aware of all electrical hazards ELECTRICITY KILLS A minimum safe distance...

Страница 6: ...uick Set retaining tube install the retaining pins Single Screw Attachment Must be attached through the center slot Multi Screw Attachment Additional screws may be added for additional security Securi...

Страница 7: ...lowest level require the use of these guardrails safety nets or personal fall protection devices Never lean or climb on a Roof Zone Guardrail Inspection of the Universal Guardrail must take place rout...

Страница 8: ...guardrail tube has been inserted into the Zip Rail Baseplate retaining tube install the retaining pins 4 Install toe boards if and whenever required Continuous Guardrail Run Leading Edge IMPORTANT Gua...

Отзывы: