Quick Set Base

Set Up Instructions

Prior to installation/set-up of the Universal Guardrail System, a competent person must develop a 

system layout plan.

1. Evaluate the surface to confirm that the guardrail system will not be installed on top of gravel or  

 

  slippery surfaces.
2. Measure the work surface area to be protected and space the Quick SET base plate accordingly
  (10 ft. centers for long runs, 7-1/2’ and or 5 ft. centers where required).
3. All Quick Set Base plates must be located a minimum distance of 18 in. from a “no curb”/parapet    
  leading edge, or opening. If the work location has a curb or parapet edge, the Quick Set Base can be  
  placed perpendicular against the rise of the structure.
4. Always be aware of all electrical hazards (ELECTRICITY KILLS). A minimum safe distance of 10 ft. away  
  from power lines and other electrical hazards must be maintained at all times.
5. Quick Set base plates must be oriented correctly with the guardrails installed perpendicular. Toe boards  
  are installed parallel to the guardrails. Safety clips pins must be inserted through all Quick Set base   
  plates and guardrails.
6. The guardrail layout must be installed in a continuous run, and must completely block all applicable   
  leading edges of potential fall hazards. Do not attempt to relocate a fully assembled system.

Continuous Guardrail Run

Leading Edge

Leading Edge

If you have any questions

call 800-241-1806 or 404-344-0000

or email: [email protected]

Содержание Juggernaut

Страница 1: ...Instruction 08342 E1739 Rev 6 22 20 Online Manual Safety Products Division 605 Stonehill Drive SW Atlanta Georgia 30336 800 241 1806 404 344 0000 www tiedown com Juggernaut and Guardrail Instructions...

Страница 2: ...Base 70756 Safety Strap 13814 Hoisting Ring Forklift Pockets Forklift Pockets 3 Triangular Hook Points 3 Triangular Hook Points Hoisting Ring Loading The Juggernaut Cart RZ Bases should be centered a...

Страница 3: ...guardrails must be secured with Pull Straps Secure bases with the pull strap by placing it over and in between the base guide post Secure the guardrails by attaching the pull straps over the mid rail...

Страница 4: ...he square mounting holes Install onto the frame as shown right using the carriage bolts and nuts provided Tighten the carriage bolts and nuts attached to the frame Next tighten the 4 nuts and bolts fo...

Страница 5: ...ation has a curb or parapet edge the Quick Set Base can be placed perpendicular against the rise of the structure 4 Always be aware of all electrical hazards ELECTRICITY KILLS A minimum safe distance...

Страница 6: ...uick Set retaining tube install the retaining pins Single Screw Attachment Must be attached through the center slot Multi Screw Attachment Additional screws may be added for additional security Securi...

Страница 7: ...lowest level require the use of these guardrails safety nets or personal fall protection devices Never lean or climb on a Roof Zone Guardrail Inspection of the Universal Guardrail must take place rout...

Страница 8: ...guardrail tube has been inserted into the Zip Rail Baseplate retaining tube install the retaining pins 4 Install toe boards if and whenever required Continuous Guardrail Run Leading Edge IMPORTANT Gua...

Отзывы: