Guardrail Outrigger

Outrigger

Assembly and Use

1. Place all Zip Rail Baseplate's around the leading edge of the fall hazard area, space the Zip Rail Baseplate's at  
  approximate lengths of the corresponding length of guardrail (10’, 7.5’ and 5’).
2. When assembling the guardrails into the Zip Rail Baseplate, position the guardrails between the fall hazard and  
  the installers work area. Position one leg of each guardrail into the outermost Zip Rail Baseplate retaining tube.  
  Maintaining the guardrail positions between the installers body and the fall hazard edge, position the tube into  
  the adjacent Zip Rail Baseplate retaining tube.
3. Once each guardrail tube has been inserted into the Zip Rail Baseplate retaining tube, install the retaining pins.
4. Install toe-boards if and whenever required.

Continuous Guardrail Run

Leading Edge

IMPORTANT!

Guardrail Outriggers MUST be used at both ends of any 

interruption in continuous guardrail sections, or at both ends 

of a continuous guardrail section.

6. The Universal Guardrail System must be installed in a continuous run, and must completely block all applicable  
  leading edges of potential fall hazards. Do not attempt to relocate a fully assembled system.
7. Guardrail Outriggers MUST be used at both ends of any interruption in continuous guardrail sections, or at both
  ends of a continuous guardrail section. See back for example.
8. A Guardrail Outrigger is installed perpendicular to a continuous guardrail run. 

IMPORTANT: Zip Base plate must be placed perpendicular to the orientation of the guardrails. The base 

can be orientated with long or short edge pointed to the direction of the leading edge. To minimize trip 

hazards, install short end of base away from leading edge.

Содержание Juggernaut

Страница 1: ...Instruction 08342 E1739 Rev 6 22 20 Online Manual Safety Products Division 605 Stonehill Drive SW Atlanta Georgia 30336 800 241 1806 404 344 0000 www tiedown com Juggernaut and Guardrail Instructions...

Страница 2: ...Base 70756 Safety Strap 13814 Hoisting Ring Forklift Pockets Forklift Pockets 3 Triangular Hook Points 3 Triangular Hook Points Hoisting Ring Loading The Juggernaut Cart RZ Bases should be centered a...

Страница 3: ...guardrails must be secured with Pull Straps Secure bases with the pull strap by placing it over and in between the base guide post Secure the guardrails by attaching the pull straps over the mid rail...

Страница 4: ...he square mounting holes Install onto the frame as shown right using the carriage bolts and nuts provided Tighten the carriage bolts and nuts attached to the frame Next tighten the 4 nuts and bolts fo...

Страница 5: ...ation has a curb or parapet edge the Quick Set Base can be placed perpendicular against the rise of the structure 4 Always be aware of all electrical hazards ELECTRICITY KILLS A minimum safe distance...

Страница 6: ...uick Set retaining tube install the retaining pins Single Screw Attachment Must be attached through the center slot Multi Screw Attachment Additional screws may be added for additional security Securi...

Страница 7: ...lowest level require the use of these guardrails safety nets or personal fall protection devices Never lean or climb on a Roof Zone Guardrail Inspection of the Universal Guardrail must take place rout...

Страница 8: ...guardrail tube has been inserted into the Zip Rail Baseplate retaining tube install the retaining pins 4 Install toe boards if and whenever required Continuous Guardrail Run Leading Edge IMPORTANT Gua...

Отзывы: