Page 5
FAC 201/301 NC/NH
Air Suction
Air Suction
Air Suction
Air Suction
Water Piping
Air Suction
Water Piping
Maintenance
Air Suction
Maintenance
Air Suction
Air Suction
Air Suction
Water Piping
Air Discharge
Air Discharge
Lifting
Unit shoul
d be wrapped and well-protected during transportation
from the factory to the construction site. Always keep the unit leveled
while lifting. Use the lifting holes provided to hoist the unit. Proper
steps should be adopted to protect the surface of the unit while
lifting. (For example, place a spreader bar to isolate the lifting cable
from the unit).
Hoisting hole
Water inlet
Water outlet
Chain
Protection
Spreader bar
Water System Installation
Water pipe installation should comply with local codes and regulations. To save cost and ensure good unit performance,
reduce the usage of U-bends and vertical piping. Please refer to the following diagram and instructions for proper piping
installation.
FCA 201/301 EC/EH
......
......
Balancing
Valve
Strainer
Return
Supply
Gate valve
(Lowest possition
for drainage)
Gate valve
Gate
valve
Thermometer
Flow
meter
Pressure
gauge
Gate valve
Expansion tank
Make up water
Air vent
Gate valve
Water
tank
Gate
valve
Strainer
Water
pump
Gate valve
(Lowest possition
for drainage)
Gate
valve
Return header
Supply header
Pressure
differential valve
Return
Supply
Chiller 1
Chiller 2
FCA 201/301 NC/NH
Balancing
Valve
Strainer
Gate valve
(Lowest possition
for drainage)
Gate valve
Return
Supply
Flow
meter
Thermometer
Gate valve
Water
tank
Gate valve
Pressure
gauge
Air vent
Make up water
Expansion tank
Strainer
Water pump
Gate valve
Gate valve
Gate valve
Gate valve
(Lowest possition
for drainage)
Return header
Supply header
Gate valve
Pressure
differential valve
Dimensions in mm