ENGINE ROOM
3-4
53 COUPE
The following equipment is installed forward of the port engine (
Figure 3-6
):
• Port engine raw water intake seacock and strainer
•
Air conditioning system’s raw water intake seacock, strainer and pump
The water heater and shore cord storage tub are located outboard of the engine
on the port chine shelf.
Figure 3-6: Forward and outboard of port engine
3.1.2 Between the Engines
A removable floor between the engines provides access to the battery banks on
boats equipped with
Volvo
®
engines.
3.1.3 Aft of Engines
The generator is installed on centerline aft of the engines (
Figure 3-7
). Refer to
the generator user manual for operating instructions. The aft side of the generator
can be accessed through the floor hatch in the transom storage compartment.
The oil changing system is located under the generator. Refer to the oil changer
user manual for operating instructions.
Содержание 53 COUPE
Страница 4: ...This page intentionally left blank ...
Страница 6: ...This page intentionally left blank ...
Страница 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Страница 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Страница 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Страница 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Страница 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Страница 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Страница 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Страница 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Страница 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Страница 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Страница 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Страница 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Страница 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Страница 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Страница 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Страница 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...