COMMISSIONING YOUR BOAT
6-9
53 COUPE
3. Prepare a solution of one (1) quart vinegar to five (5) gallons fresh water.
4. Pour the vinegar solution into the water tank through the WATER fill fit
-
ting.
5. Repeat steps 3 and 4 (10 gallons of vinegar solution total).
6. Allow the vinegar solution to agitate in the tank for 24 hours.
7. Drain the vinegar solution by opening all faucets (hot & cold), setting
single faucets to the warm position,
and empty the water tank. When the
water tank is empty, switch the pump breakers OFF.
8. Close all faucets.
9. Fill the fresh water tank with clean, fresh water. The tank should be filled
until water runs out of the fill fitting.
10. Switch ON the FRESH WATER PUMP 1 & 2 breakers.
11. Open each faucet. When a smooth flow of water is observed from the
hot and cold tap, close the faucet. When all faucets are closed, the
pump will shut off as the system pressure increases. Any air should now
be purged from the system. Leave the FRESH WATER PUMP 1 & 2
breakers ON.
6.3.2 Electrical Systems
Connect to shore power following the directions in chapter 5. Power up all AC
and DC components to ensure they operate correctly. Report any problems or
questions to your Tiara Yachts dealer.
Follow the start-up procedures recommended in the generator user manual,
including a check of generator fluids. Start your generator and confirm that all
AC components are operating correctly.
Содержание 53 COUPE
Страница 4: ...This page intentionally left blank ...
Страница 6: ...This page intentionally left blank ...
Страница 11: ...SAFETY LABEL LOCATIONS iii 53 COUPE 10 10 2 2 24 24 24 24 16 16 22 23 17 12 3 23 22 20 ...
Страница 24: ...TABLE OF CONTENTS TOC 8 53 COUPE This page intentionally left blank ...
Страница 50: ...EQUIPMENT AND FEATURES 1 24 53 COUPE This page intentionally left blank ...
Страница 59: ...BELOW DECK FEATURES EQUIPMENT 2 9 53 COUPE Figure 2 8 VIP head Figure 2 9 Utility room ...
Страница 96: ...OPERATING YOUR BOAT 5 20 53 COUPE This page intentionally left blank ...
Страница 108: ...COMMISSIONING YOUR BOAT 6 12 53 COUPE This page intentionally left blank ...
Страница 130: ...ROUTINE MAINTENANCE 7 22 53 COUPE This page intentionally left blank ...
Страница 153: ...APPENDIX C MAINTENANCE SCHEDULES C 3 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 154: ...APPENDIX C MAINTENANCE SCHEDULES C 4 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 155: ...APPENDIX C MAINTENANCE SCHEDULES C 5 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 156: ...APPENDIX C MAINTENANCE SCHEDULES C 6 53 COUPE DATE MAINTENANCE REPAIR LOG OPERATING HOURS ...
Страница 157: ...D 1 53 COUPE Appendix D BOATING ACCIDENT REPORT ...
Страница 158: ...APPENDIX D BOATING ACCIDENT REPORT D 2 53 COUPE ...
Страница 159: ...APPENDIX D BOATING ACCIDENT REPORT D 3 53 COUPE ...
Страница 160: ...APPENDIX D BOATING ACCIDENT REPORT D 4 53 COUPE ...
Страница 161: ...APPENDIX D BOATING ACCIDENT REPORT D 5 53 COUPE ...
Страница 162: ...APPENDIX D BOATING ACCIDENT REPORT D 6 53 COUPE ...
Страница 163: ...E 1 53 COUPE Appendix E FLOAT PLAN ...
Страница 164: ...APPENDIX E FLOAT PLAN E 2 53 COUPE ...
Страница 166: ...APPENDIX E FLOAT PLAN E 4 53 COUPE Operator Notes ...