
Operating manual
Installation
TW63B drive
thyssenkrupp Aufzugswerke
48
Version 09/2018
6.3 Mounting the rope guard
1. Use the enclosed screws to bolt the rope guard onto the rope guard carrier.
2. Pivot the rope guard carrier to set the guard in such a way that the gap between
the rope and guard on the rope run-in and run-out side of the traction sheave is
as small as possible. (1 -2 mm)
3. With inclined pulling, adapt the location of the rope guard carrier by remounting
the changed rope pull direction.
Tighten the securing bolts of the rope guard carrier on the gear drive after alignment
with the prescribed tightening torque.
Chapter
Item Designation
Item Designation
1
Rope guard carrier
2
Rope guard
Fig. 6.3-1
CAUTION
Danger with a low degree of risk!
May lead to minor or moderate injury.
For machines with rope run-in direction from 0 - 90°above
horizontal (e.g. machine arrangement down/up beside),
an additional rope guard is required to prevent foreign
bodies penetrating between the rope and grooves.
If the rope run-in zone is protected within the machine base frame, the function
"protection against injury" is not required.
For SA9 traction sheave in the shaft, no rope guard is fitted at the plant.
1
2
1
2
max. 1-2 mm
Содержание TW63B
Страница 1: ...thyssenkrupp Aufzugswerke Operating manual TW63B drive...
Страница 84: ...Part No 9950 000 6021 mit 1024 Imp Part No 9950 000 6021 mit 4096 Imp...
Страница 85: ...Part No 00 990 16 03 0 with 1024 pulses...
Страница 86: ...Part No 00 990 19 03 0 mit 1024 Imp...
Страница 87: ......
Страница 103: ...Design for TW63...
Страница 104: ......