
Operating manual
Installation
TW63B drive
thyssenkrupp Aufzugswerke
45
Version 09/2018
6 Installation
6.1 Setting up the machine base frame
The base frame is set up depending on the customer on supports, beams, a concrete
pedestal or directly cast in the machine room floor.
For reducing noise and sound transmission, we offer insulation elements, which can
be inserted between the frame supports and the ground. These differ according to the
type of mounting:
Rubber block 100 x 100 x 50 without packing.
For mounting the drive on the machine room floor without a cement floor
or directly surface-mounted on the cement floor.
Rubber block 100 x 100 x 50 with additional packing 140 x 140 x 80 mm
For installation on cement floor, packing cast into cement floor
(thickness
≤ 60 mm). The packing component must be cast in when
installing the cement floor.
The number and arrangement of rubber elements is based on the total load and
distance between the rope departures (ASL) dimension.
When arranging the supports, the overall centre of gravity must lie within the rubber
elements.
The arrangement under the machine base frame should be such that the stress
and/or buffering of the insulation elements (maximum difference 3 - 5 mm) is as even
as possible.
1. Loosely bolt together the delivered base frame in the machine room.
2. Mount the supports with additional drilled holes and pulley support on the side of
the deflecting pulley.
Содержание TW63B
Страница 1: ...thyssenkrupp Aufzugswerke Operating manual TW63B drive...
Страница 84: ...Part No 9950 000 6021 mit 1024 Imp Part No 9950 000 6021 mit 4096 Imp...
Страница 85: ...Part No 00 990 16 03 0 with 1024 pulses...
Страница 86: ...Part No 00 990 19 03 0 mit 1024 Imp...
Страница 87: ......
Страница 103: ...Design for TW63...
Страница 104: ......