3 Installation
3.1 Notes for Installation
Unauthorized modifications or conversions of the instrument are
not allowed!
Installation location: Indoor
For not fully air conditioned open buildings and operation rooms:
Temperature:
0°C ... +40°C
Rel. Humidity:
5 - 85%, not condensing
Air pressure:
860 - 1050 hPa
3.2 Vacuum Connection
Dirt and damage, especially at the vacuum flange, have an
adverse effect on the function of this vacuum component.
Please take account of the necessary instructions with regard to
cleanliness and damage prevention when using vacuum
components.
-
Remove the protective cover (is required again during maintenance work!)
-
Make vacuum connection via small flange DN16 ISO KF
-
Use clamps, that can be opened and closed with appropriate tools only (e.g.
strap retainer-tension-ring)
-
Use sealing rings with a centering ring.
Overpressure in the vacuum system > 1 bar
Accidental or unintended opening of clamp elements under
stress can lead to injuries due to parts flying around!
Overpressure in the vacuum system 1,5 to 2 bar
KF flange connections with elastomer sealings cannot withstand
such pressures. Process media thus can leak and possibly
damage your health.
Содержание VD82EX
Страница 18: ...18 Konformit tserkl rung...
Страница 35: ...Declaration of Conformity...
Страница 36: ...36...
Страница 53: ...53 D claration de conformit...
Страница 54: ......
Страница 55: ......
Страница 56: ......