Chapter 3
Page 19
3.8 Verifying Software Operation
3.8.1 Initial Setup
The APT Software should be installed (Section 3.1.) and the power up procedure
performed (Section 3.7.) before software operation can be verified.
1) Run the APTUser utility and check that the Graphical User Interface (GUI) panels
appear and are active (one panel for each channel of operation).
Fig. 3.4 GUI panel showing jog and ident buttons
2) Click the ‘Ident’ button. The screen on the front panel of the controller flashes.
This is useful in multi-channel systems for identifying which driver unit is
associated with which GUI.
3) Click the jog buttons on the GUI panel and check that the motor or axis connected
to the controller moves. The position display for the associated GUI should
increment and decrement accordingly.
Follow the tutorial steps described in Chapter 5 for further verification of operation.
simulated setup, enable Simulator Mode and set up a ‘Simulated
instructions.
Note
Содержание BBD301
Страница 1: ...Original Instructions BBD301 BBD302 BBD303 Brushless DC Motor Controllers APT User Guide ...
Страница 20: ......
Страница 30: ......
Страница 72: ......
Страница 82: ...Page 79 Appendix F Regulatory F 1 Declarations Of Conformity F 1 1 For Customers in Europe CE certificate ...
Страница 85: ...HA0409T Rev BAug2021 www thorlabs com ...