![THOMSON grass valley XtenDD Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/thomson/grass-valley-xtendd/grass-valley-xtendd_manual_1110062031.webp)
2. Technical Data
2 - 2
Planning and Installation - Rev. 0 / 04.2002
2.1.4
POWER SUPPLY
Optional redundant power supply
Line voltage
100V - 240V AC
"
10%
Line frequency
50Hz/60Hz
"
5%
Power consumption
Max. 700 W (mainframe)
Touch (leakage) currents
< 2.5 mA (for each power supply)
2.1.5
MECHANICAL DATA
Dimensions mainframe
19” rack frame, 7RU high
310(h) x 483 (w) x 508 (d) mm
12.2” (h) x 19” (w) x 20” (d)
Weight mainframe
< 35kg (including all options)
2.1.6
ENVIRONMENTAL DATA
Storage temperature:
-20
°
C to +70
°
C (-4
°
F to 158
°
F)
Operating temperature:
+5
°
C to +40
°
C (41
°
F to 104
°
F)
Relative humidity:
v
80% non-condensing
Electromagnetic enviroment:
E2 (according to EN 55103-1, -2)
2.1.7
INTERFACE DATA
GPI/GPO
8 internal GPI, 8 intern GPO, max. 40mA
Serial ports
10 serial ports RS 485/422 at the mainframe,
4 serial ports RS 232
LAN
RJ45 or BNC connectors for internal (panel)
and external LAN connections
Protocols
Amongst many others, editor protocols,
Router protocols, esam 2, Peripheral Bus II,
Odetics “Broadcast Video Server” protocol,
Louth “Video Disk Communication” protocol,
protocols for DVE (Accom, Questech, Pinnacle,
Ampex, GVG, Sony) and Automation Protocol.
Содержание grass valley XtenDD
Страница 17: ...Contents VI Planning and Installation Rev 0 04 2002 ...
Страница 27: ...1 General 1 10 Planning and Installation Rev 0 04 2002 1 5 OVERALL BLOCK DIAGAM VIDEO ...
Страница 29: ...1 General 1 12 Planning and Installation Rev 0 04 2002 ...
Страница 33: ...2 Technical Data 2 4 Planning and Installation Rev 0 04 2002 ...
Страница 39: ...3 Mounting Instructions 3 6 Planning and Installation Rev 0 04 2002 ...
Страница 45: ...3 Mounting Instructions 3 12 Planning and Installation Rev 0 04 2002 ...
Страница 61: ...3 Mounting Instructions 3 28 Planning and Installation Rev 0 04 2002 ...
Страница 69: ...4 Connection and Startup 4 8 Planning and Installation Rev 0 04 2002 ...
Страница 71: ...4 Connection and Startup 4 10 Planning and Installation Rev 0 04 2002 ...
Страница 75: ...4 Connection and Startup 4 14 Planning and Installation Rev 0 04 2002 ...
Страница 79: ...4 Connection and Startup 4 18 Planning and Installation Rev 0 04 2002 ...
Страница 87: ...4 Connection and Startup 4 26 Planning and Installation Rev 0 04 2002 ...
Страница 101: ...4 Connection and Startup 4 40 Planning and Installation Rev 0 04 2002 ...
Страница 105: ...4 Connection and Startup 4 44 Planning and Installation Rev 0 04 2002 ...
Страница 137: ...5 Initial Installation 5 32 Planning and Installation Rev 0 04 2002 ...
Страница 138: ...5 Initial Installation 5 33 Planning and Installation Rev 0 04 2002 ...
Страница 141: ...6 Installing System Accessories 6 3 Planning and Installation Rev 0 04 2002 ...
Страница 162: ...6 Installing System Accessories 6 24 Planning and Installation Rev 0 04 2002 ...
Страница 172: ...6 Installing System Accessories 6 34 Planning and Installation Rev 0 04 2002 ...
Страница 196: ...7 Installing External Devices 7 24 Planning and Installation Rev 0 04 2002 ...
Страница 214: ...7 Installing External Devices 7 42 Planning and Installation Rev 0 04 2002 ...
Страница 218: ...7 Installing External Devices 7 46 Planning and Installation Rev 0 04 2002 ...
Страница 226: ...7 Installing External Devices 7 54 Planning and Installation Rev 0 04 2002 ...
Страница 244: ...7 Installing External Devices 7 72 Planning and Installation Rev 0 04 2002 ...
Страница 250: ...7 Installing External Devices 7 78 Planning and Installation Rev 0 04 2002 ...