THERMOBILE INDUSTRIES BV
INSTRUCTIONMANUAL PELLETHEATER
12
3
PREPARATIONS
Caution
Make sure to always follow the local standards and guidelines.
3.1
Removing the packaging
1.
Remove the packaging material from the convector heater.
2.
Lift the convector heater to transport it to its location of use.
Caution
Lift the convector heater according to the instructions (fig. 2).
3.2
Installation
1.
Make sure the convector heater is level.
2.
Connect the pellet storage to the burner.(See fig. 14). (See APPENDIX D for settings
suction unit.)
3.
Connect the ash container to the heater.(See fig. 11).
4.
Connect the exhaust air fan and flue to the heater.(See fig. 8).
5.
Make sure there is sufficient distance between the wall and the air inlet. Minimum
distance is 1 m.
6.
Ensure that the heated air is allowed to flow freely. The minimum distance between
the outlet and any obstacle is 5 m.
7.
Check the ventilation surface: per kW, a surface area of 25 cm2 is required.
8.
Check the connection of the room thermostat.
9.
Make sure the convector heater is switched off. (See fig. 4.)
10.
Check the power supply: refer to the identification plate.
11.
Connect the convector heater to the socket of the electric power supply. The indicator
light “Panel live” is on (white).
12.
If necessary, press pushbutton 'Reset burner', (See fig. 4.)
13.
Reset the thermostat. (See fig. 4.)
Caution
Use certified pellets only.
Certified pellets
ENplus-A1, ENplus-A2 EN-B
(EN14961-2)
Calorific value
4700-5100 kWh/ton
Bulk density
ca 650-670 kg/m3
Volume of 1 ton
1.5-1.6 m³
Section
6-8 mm
Length
3-5 x diameter
Fines content (<3,2 mm)
< 1%
Moisture content
8-10 %
Ash content
< 3%
Ash fusion
> 1100 c°
1000 L light oil
ca 2000KG or 3 m³
1m³ Pellets
330L oil
5 kWh/kg Pellets
11,9 kWh/kg Oil
3.3
Starting up
To start up the heating:
1.
Switch on suction unit
2.
Switch the rotary switch to position 2. (
See fig. 4.)
The burner starts and produces
heat. After some time the ventilator switches on automatically.
3.
Set the room thermostat.
To start up the ventilation:
1.
Switch the rotary switch to position 1.
See fig. (4).
The fan will start up.
Содержание IMAC 2000 PELLET
Страница 2: ...THERMOBILE INDUSTRIES BV INSTRUCTIONMANUAL PELLETHEATER 2 A B C Fig 1 Fig 2 Fig 3 Fig 4 ...
Страница 3: ...THERMOBILE INDUSTRIES BV INSTRUCTIONMANUAL PELLETHEATER 3 ...
Страница 21: ...THERMOBILE INDUSTRIES BV INSTRUCTIONMANUAL PELLETHEATER 21 APPENDIX E ...
Страница 22: ...THERMOBILE INDUSTRIES BV INSTRUCTIONMANUAL PELLETHEATER 22 ...