Dionex ICS-5000 Operator’s Manual
xii
Doc. 065342-06 12/11
9.15.2 Installing and Flushing the New CR-TC . . . . . . . . . . . . . . 350
9.15.3 Completing the New CR-TC Plumbing . . . . . . . . . . . . . . . 353
9.16 Replacing the RFIC Eluent Degasser . . . . . . . . . . . . . . . . . . . . . . . . 355
9.17 Installing a Backpressure Coil . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 355
9.18 Changing the EG Main Power Fuses . . . . . . . . . . . . . . . . . . . . . . . . 357
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359
9.19 Replacing Tubing and Fittings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 359
9.19.1 Tubing and Fittings for Capillary IC Systems . . . . . . . . . . 359
9.19.2 Tubing and Fittings for Analytical IC Systems . . . . . . . . . 362
9.20 Connecting a Sample Loading Port to the Injection Valve . . . . . . . 363
9.21 Replacing the Leak Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 364
9.22 Rebuilding a High-Pressure (Injection) Valve . . . . . . . . . . . . . . . . . 366
9.23 Replacing a High-Pressure (Injection) Valve Pod . . . . . . . . . . . . . . 367
9.24 Installing or Replacing an I/O Option Board . . . . . . . . . . . . . . . . . . 369
9.25 Changing the DC Main Power Fuses . . . . . . . . . . . . . . . . . . . . . . . . 371
9.26 IC Cube Service Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 372
9.26.1 Replacing an IC Cube Cartridge . . . . . . . . . . . . . . . . . . . . . 372
9.26.2 Replacing Capillary Columns . . . . . . . . . . . . . . . . . . . . . . . 374
9.27 CD Service Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 379
9.27.1 Calibrating the CD Cell . . . . . . . . . . . . . . . . . . . . . . . . . . . 379
9.27.2 Replacing an Analytical Suppressor . . . . . . . . . . . . . . . . . . 381
9.27.3 Replacing a CD . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 382
9.27.4 Removing Trapped Air from the Conductivity Cell . . . . . . 383
9.28 ED Service Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 385
Содержание Dionex ICS-5000
Страница 29: ...1 Introduction Doc 065342 06 12 11 13 Figure 1 3 Chromeleon 6 8 Panel Tabset Dionex ICS 5000 Home Panel Shown ...
Страница 66: ...Dionex ICS 5000 Operator s Manual 50 Doc 065342 06 12 11 ...
Страница 130: ...Dionex ICS 5000 Operator s Manual 114 Doc 065342 06 12 11 ...
Страница 168: ...Dionex ICS 5000 Operator s Manual 152 Doc 065342 06 12 11 ...
Страница 176: ...Dionex ICS 5000 Operator s Manual 160 Doc 065342 06 12 11 ...
Страница 184: ...Dionex ICS 5000 Operator s Manual 168 Doc 065342 06 12 11 ...
Страница 200: ...Dionex ICS 5000 Operator s Manual 184 Doc 065342 06 12 11 ...
Страница 206: ...Dionex ICS 5000 Operator s Manual 190 Doc 065342 06 12 11 ...
Страница 210: ...Dionex ICS 5000 Operator s Manual 194 Doc 065342 06 12 11 ...
Страница 214: ...Dionex ICS 5000 Operator s Manual 198 Doc 065342 06 12 11 ...
Страница 256: ...Dionex ICS 5000 Operator s Manual 240 Doc 065342 06 12 11 ...
Страница 274: ...Dionex ICS 5000 Operator s Manual 258 Doc 065342 06 12 11 ...
Страница 318: ...Dionex ICS 5000 Operator s Manual 302 Doc 065342 06 12 11 ...
Страница 348: ...Dionex ICS 5000 Operator s Manual 332 Doc 065342 06 12 11 ...
Страница 374: ...Dionex ICS 5000 Operator s Manual 358 Doc 065342 06 12 11 ...
Страница 422: ...Dionex ICS 5000 Operator s Manual 406 Doc 065342 06 12 11 ...
Страница 434: ...Dionex ICS 5000 Operator s Manual 418 Doc 065342 06 12 11 ...
Страница 438: ...Dionex ICS 5000 Operator s Manual 422 Doc 065342 06 12 11 ...
Страница 448: ...Dionex ICS 5000 Operator s Manual 432 Doc 065342 06 12 11 ...
Страница 454: ...Dionex ICS 5000 Operator s Manual 438 Doc 065342 06 12 11 ...
Страница 462: ...Dionex ICS 5000 Operator s Manual 446 Doc 065342 06 12 11 ...
Страница 482: ...Dionex ICS 5000 Operator s Manual Index 20 Doc 065342 06 12 11 ...