8-4
DB-070 E
RadEye AB100
Pi/Ff 04.05.2021
•
“Plateau measurement: 10 s” (The current plateau measure-
ment is running, and 10 seconds remains, i.e. the remaining
measuring time is displayed).
•
“Plateau measurement complete!” (The plateau measurement
is ready for evaluation and printout; a new plateau measure-
ment can be started).
•
“Reset HV 10 s” (The plateau measurement has been termi-
nated/cancelled and the high voltage is re-set to the operating
voltage. The remaining waiting time is displayed.
8.1.2
Plateau measurement parameters
The voltage values for the start and the end of the plateau meas-
urement are entered into the corresponding text boxes marked
“Start HV [V]” and “End HV [V]”.
Figure 8-3
Plateau parameter
The text box “Step” defines the step size, i.e. the amount of volts
by which the voltage is increased after each individual measure-
ment. The measuring time for an individual measurement must be
entered into the “Preset time [s]” text box.
Содержание DB-070 E
Страница 1: ...Operating Instructions DB 070 E RadEye AB100 Multi Purpose Survey Meter ...
Страница 2: ......
Страница 12: ......
Страница 42: ......
Страница 56: ......
Страница 80: ...7 18 DB 070 E RadEye AB100 Pi Ff 04 05 2021 Figure 7 15 Logbook ...
Страница 92: ......
Страница 98: ......
Страница 103: ...RadEye AB100 DB 070 E 11 3 Pi Ff 04 05 2021 ...
Страница 104: ......
Страница 114: ......
Страница 116: ......
Страница 117: ......