RadEye AB100
DB-070 E
0-3
Pi/Ff 04.05.2021
CONTENTS:
Introduction ..................................... 1-1
Installation and start-up .................. 2-1
Scope of delivery ...................................................... 2-1
Inserting the battery .................................................. 2-2
Switching the unit on ................................................ 2-3
Configuration ................................... 3-1
Menu functions ......................................................... 3-1
Menu structure ................................................... 3-3
Main menu ......................................................... 3-8
Background ........................................................ 3-8
Measuring unit ................................................... 3-9
Operation mode ................................................. 3-9
Scaler parameter ................................................ 3-9
Nuclide table .................................................... 3-10
Settings ............................................................ 3-10
Alarm indication .............................................. 3-11
Содержание DB-070 E
Страница 1: ...Operating Instructions DB 070 E RadEye AB100 Multi Purpose Survey Meter ...
Страница 2: ......
Страница 12: ......
Страница 42: ......
Страница 56: ......
Страница 80: ...7 18 DB 070 E RadEye AB100 Pi Ff 04 05 2021 Figure 7 15 Logbook ...
Страница 92: ......
Страница 98: ......
Страница 103: ...RadEye AB100 DB 070 E 11 3 Pi Ff 04 05 2021 ...
Страница 104: ......
Страница 114: ......
Страница 116: ......
Страница 117: ......