Type II Water System
4-1
Thermo Scientific
Section 4
Using Your TII
1. Turn the system power ON by depressing the main power switch to
the “I” position.
2. The system electronics will initialize and check its calibration. All units
have been factory calibrated.
3. The unit will enter STANDBY mode.
4. From STANDBY, press the START/STOP switch on the control panel
to enter the RUN mode. The unit’s RO pump will begin to run.
5. The display will then begin reading resistivity of the system product
water. Initially, it will read “PROCESSING” while the DI meter is
initializing. The DI section will not operate until the tank is 25% full.
6. Allow the water’s resistivity to rise to the desired purity before
dispensing water.
7. The system should be left in RUN during the workday.
8. If the Thermo Scientific TII is to be shut down for an extended period
of time, the unit should be completely drained and the cartridges and
membrane(s) removed and refrigerated to prevent the growth of
bacteria.
The TII is controlled through a panel that incorporates buttons to control
its functions. This control panel utilizes a graphical display to show system
information and the purity of the product water. The intensity of the
display may be adjusted according to user preference. Refer to “Setting
System Options.”
Warning
Do not use in the
presence of flammable or
combustible materials; fire or
explosion may result. This
device contains components
that may ignite such materials.
s
Normal Operation
Control Panel
Figure 4-1.
TII Control Panel
Содержание 7165
Страница 9: ......
Страница 51: ......
Страница 67: ......
Страница 72: ...Type II Water System 7 1 Thermo Scientific WIRING DIAGRAMS ...
Страница 73: ...7 2 Type II Water System Thermo Scientific Section 7 Wiring Diagrams ...
Страница 74: ...Type II Water System 8 1 Thermo Scientific Maintenance Log Date Description Parts Needed Part Notes ...
Страница 75: ......
Страница 76: ...Thermo Fisher Scientific 401 Millcreek Road Marietta Ohio 45750 United States www thermofisher com ...