6
6. Connection Diagram
L N N
P/S
L
N
Channel
1 Load
Push
Button
230V AC 50Hz Mains Supply
Live (Brown or Red) to L
Neutral (Blue or Black to N
PDSM361AB: Wiring Configuration
Load
Switched Live
(Brown or Red) to
Neutral (Blue or Black to N
• Locate the terminal connections and terminate the
cables into the terminal block ensuring that the correct
polarity is observed and that all bare conductors are sleeved.
(See Section 6. Connection Diagram)
• When wiring is complete, tighten the non-dropping screws
shown in the above illustration to secure the PIR to the base
plate and ensure not to over tighten.