5
Non-dropping
screws
• Knock out the most appropriate
cable entry points on the base
plate for the installtion required.
• Pass the 230V 50Hz mains supply and load cables through
the hole and prepare for termination.
• Drill the holes and insert he rawl plugs into position.
• Secure the base palte to the ceiling using the screws
provided.