A7
A8
Stay Bar Configuration A - SB1
13/20
Using a 5mm high quality drill bit for a
clean and precise hole, drill the marked
areas, fully insert the wall plugs and fix
the connectors to the wall.
Professional Tip
If drilling ceramic tiles, place
masking tape on the tiles before
marking and drill through the
tape to prevent the drill bit from
skidding.
DO NOT use Hammer Action as
this will break the tiles.
Posi�on the stay bar connectors central
to the markings. With a small drill bit
mark the holes for drilling.
Use masking tape on the �les to mark.
07/2019 V 2.2