BHT-412-MM-2
5-00-00
Export Classification C, ECCN EAR99
Refer to the applicable Pratt & Whitney Canada
Engine Maintenance Manual for inspection and
overhaul tolerances.
The following provides examples of when hourly,
calendar, or hourly/calendar inspection tolerances
have been applied:
Hourly Example (10% or up to a maximum of 100 hours, whichever is less):
300-HOUR
INSPECTION
DUE AT:
MAXIMUM ALLOWED
TOLERANCE
INSPECTION CARRIED
OUT AT:
NEXT 300-HOUR
INSPECTION
DUE AT:
3400 Hours
10% of 300 hours = 30 hours
3430 Hours
(10% tolerance applied)
3730 Hours
3730 Hours
10% of 300 hours = 30 hours
3750 Hours
(within 10% tolerance)
4050 Hours
4050 Hours
10% of 300 hours = 30 hours
4050 Hours
(tolerance not applied)
4350 Hours
Calendar Example (10% or up to a maximum of 30 days calendar time, whichever is less):
12-MONTH
INSPECTION
DUE ON:
MAXIMUM ALLOWED
TOLERANCE
INSPECTION CARRIED
OUT ON:
NEXT 12-MONTH
INSPECTION
DUE ON:
June 10, 2010
10% of 12 months = 1.2 months
(maximum allowed is 30 days)
July 8, 2010
(within 30 day tolerance)
July 31, 2011
July 31, 2011
10% of 12 months = 1.2 months
(maximum allowed is 30 days)
June 15, 2011
(completed early)
June 30, 2012
June 30, 2012
10% of 12 months = 1.2 months
(maximum allowed is 30 days)
June 30, 2012
(tolerance not applied)
June 30, 2013
NOTE:
The last day of the month applies for the next inspection (
paragraph 5-3B
, calendar time).
1
1
1
1
7 NOV 2016
Rev. 25
Page 6A
Содержание Bell 412
Страница 6: ......
Страница 12: ......
Страница 32: ......
Страница 40: ......
Страница 152: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 164: ......
Страница 166: ......
Страница 168: ......
Страница 172: ......
Страница 174: ......
Страница 198: ......
Страница 202: ......
Страница 220: ......
Страница 224: ......
Страница 232: ......
Страница 234: ......
Страница 236: ......
Страница 242: ......
Страница 256: ......
Страница 262: ......
Страница 268: ......
Страница 288: ......