BHT-412-MM-2
5-00-00
Export Classification C, ECCN EAR99
SCHEDULED INSPECTIONS
5-27A. EACH 24 MONTHS OF MAIN ROTOR MAST OPERATION
DATA REFERENCES
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: _________________
_________________________
HELICOPTER S/N: __________
_________________________
REGISTRY NO.: ____________
_________________________
TOTAL TIME:_______________________________________
SIGNATURE: _______________
_________________________
NOTE
Accomplish every 24 months of main rotor mast
operation when operating in a non-corrosive
environment. If helicopter is operated in a corrosive
environment, it is recommended this inspection be
accomplished every 12 months.
MAIN ROTOR MAST ASSEMBLY (412-040-366-SERIES
AND 412-040-368-SERIES)
Chapter 62
1.
Remove main rotor hub assembly.
BHT-412-CR&O
Chapter 63
2.
Clean then visually inspect main rotor mast upper splines
for corrosion.
Chapter 62
3.
Install main rotor hub assembly.
01 JUN 2018
Rev. 26
Page 150A/150B
Содержание Bell 412
Страница 6: ......
Страница 12: ......
Страница 32: ......
Страница 40: ......
Страница 152: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 164: ......
Страница 166: ......
Страница 168: ......
Страница 172: ......
Страница 174: ......
Страница 198: ......
Страница 202: ......
Страница 220: ......
Страница 224: ......
Страница 232: ......
Страница 234: ......
Страница 236: ......
Страница 242: ......
Страница 256: ......
Страница 262: ......
Страница 268: ......
Страница 288: ......