BHT-412-MM-2
5-00-00
Page 102
Rev. 23
15 DEC 2015
Export Classification C, ECCN EAR99
b.
Electrical and avionics equipment from the nose area,
as required, to allow a full visual inspection of the nose area to
be performed.
c.
Main rotor transmission.
d.
Intermediate gearbox.
e.
Tail rotor gearbox.
f.
Deleted
g.
Tailboom (to allow a full inspection of the aft fuselage
bulkhead and forward tailboom bulkhead).
h.
Landing gear assembly (to allow a complete inspection
of the landing gear attachment points and support structure).
4.
In addition to the 5000 Hour/5 Year Inspection — Part B
items, do the following:
a.
Complete 25 Hour/30 Day Inspection — Part B.
b.
Complete 300 Hour/12 Month Inspection — Part B.
c.
Complete 600 Hour/12 Month Inspection — Part B.
AFTER COMPLETION OF INSPECTION
1.
Install the following items:
a.
Main battery.
b.
Electrical and avionics equipment on the nose area.
c.
Main rotor transmission.
d.
Intermediate gearbox.
e.
Tail rotor gearbox.
f.
Deleted
SCHEDULED INSPECTIONS
5-12.
5000 HOUR/5 YEAR INSPECTION — PART B (CONT)
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
Содержание Bell 412
Страница 6: ......
Страница 12: ......
Страница 32: ......
Страница 40: ......
Страница 152: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 164: ......
Страница 166: ......
Страница 168: ......
Страница 172: ......
Страница 174: ......
Страница 198: ......
Страница 202: ......
Страница 220: ......
Страница 224: ......
Страница 232: ......
Страница 234: ......
Страница 236: ......
Страница 242: ......
Страница 256: ......
Страница 262: ......
Страница 268: ......
Страница 288: ......