BHT-412-MM-2
5-00-00
Export Classification C, ECCN EAR99
SPECIAL INSPECTIONS
5-15.
BETWEEN 1 AND 5 FLIGHT HOURS AFTER MAIN ROTOR HUB INSTALLATION
DATA REFERENCE
INSPECTION TASK DESCRIPTION
INITIAL
MECH OTHER
DATE: __________________W.O. _____________________
FACILITY: _________________
_________________________
HELICOPTER S/N: __________
_________________________
REGISTRY NO.: ____________
_________________________
TOTAL TIME:_______________________________________
SIGNATURE: _______________
_________________________
NOTE
Accomplish between 1 and 5 hours of flight after
installation of main rotor hub.
Chapter 62
MAIN ROTOR HUB
1.
Torque check eight main rotor hub/yoke through bolt nuts
to 70 to 80 foot-pounds (95 to 108 Nm).
CAUTION
SPECIAL TORQUE SEQUENCE REQUIRED FOR
FOLLOWING STEPS.
2.
Torque check eight main rotor hub cap bolt assemblies to
250 to 260 inch-pounds (28.25 to 29.37 Nm).
3.
Torque check lower cone bolts to 125 to 135 inch-pounds
(14.13 to 15.26 Nm).
26 FEB 2013
Rev. 16
Page 113/114
Содержание Bell 412
Страница 6: ......
Страница 12: ......
Страница 32: ......
Страница 40: ......
Страница 152: ......
Страница 154: ......
Страница 156: ......
Страница 158: ......
Страница 160: ......
Страница 164: ......
Страница 166: ......
Страница 168: ......
Страница 172: ......
Страница 174: ......
Страница 198: ......
Страница 202: ......
Страница 220: ......
Страница 224: ......
Страница 232: ......
Страница 234: ......
Страница 236: ......
Страница 242: ......
Страница 256: ......
Страница 262: ......
Страница 268: ......
Страница 288: ......