4. How Auto Test Works
Creating the Cable Test Schedule in Plan-Um, uploading it to the
Validator, and running Auto Test is the easiest and most efficient way
to verify cables. See the Uploading/Downloading Jobs section of this
manual (or the Plan-Um Software Instructions) for detailed instructions
on how to upload and download job information and test results between
Plan-Um and the Validator.
When you have uploaded a job from Plan-Um to the Validator-NT main
unit, the job will appear in the list on the
Job Manager
screen. To run an
existing job, you must first open it from the Job Manager before using it
with Auto Test.
When you open a job, the Auto Test screen appears. This screen gives
you five options:
Cable Test Schedule, Site Information, Contractor
Information, Custom Cable Definitions and Job Utilities
. See Figure
4.1 for a Flowchart of the Auto Test process.
Validator
TM
How AutoTest Works
Validator
TM
How AutoTest Works