![Terex TS14G Скачать руководство пользователя страница 350](http://html1.mh-extra.com/html/terex/ts14g/ts14g_maintenance-manual_1088883350.webp)
Section 280-0040
Bowl - Bowl Linkage
SM 1891 1-00
2
6. Support levers (7), with suitable lifting equipment, to
keep them from falling and to take weight off lever pin
(1). Remove cotter pin (2) from pin (1). Drive pin (1)
out and remove spacers (3). Remove levers (7) and
place in a suitable working area.
7. Remove bushings (8) if scored or scratched.
INSPECTION
Numbers in parentheses refer to Fig. 1.
1. Check levers (7) for cracks or bends and repair or
replace as necessary.
2. Check bushing (8), pins (1, 4 & 13), bores in levers
(7) and lift rods (14) and roller (12), if used, for
excessive wear and replace parts as necessary.
3. Inspect all bolts and nuts for stripping or bends and
replace as necessary.
INSTALLATION
Numbers in parentheses refer to Fig. 1.
Note:
Tighten all fasteners to standard torques listed
in Section 300-0080, STANDARD BOLT AND NUT
TORQUE SPECIFICATIONS.
1. If removed, press bushing (8) into bowl levers (7).
WARNING
Before any welding is done on a machine
equipped with the HEUI electronic
management system, disconnect the following
in this order: Battery earth cable, battery
supply cable, alternator earth cables, alternator
supply cables, front & rear transmission ECU
connectors (located behind access door below
cab door) and front & rear engine ECU
connectors (located on LH side of engine).
Turn off battery master switch before
disconnecting any components. After welding
connect all of the above in the reverse order.
3. Support levers (7) with a suitable lifting device and
drive lever mounting pin (1) through bores containing
bushings (8) of bowl levers and spacers (3). Install
cotter pin (2) on each end of pin (1).
4. Install levers (7) to bowl cylinders by installing pins
(4) and securing with bolts (5), lockwashers (9) and
nuts (10). Install grease fittings (6) in pins (4).
5. Connect lift rods (14) to bowl levers (7) by installing
pins (4) and securing with bolts (5) and nuts (11).
Install grease fittings (6) in pins (4).
6. Position lift rods (14) and rollers (12), to brackets on
bowl and secure with pins (13). Secure pins (13) with
bolts (5), lockwashers (9) and nuts (10). Replace
grease fittings (6).
SPECIAL TOOLS
There are no special tools required for procedures
outlined in this section. Refer to Section 300-0070,
SERVICE TOOLS, for part numbers of the general
service tools required. These tools are available from
your dealer.
* * * *
Содержание TS14G
Страница 2: ...Courtesy of Machine Market...
Страница 4: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market...
Страница 6: ...THIS PAGE IS INTENTIONALLY LEFT BLANK Courtesy of Machine Market...
Страница 12: ...Courtesy of Machine Market...
Страница 26: ...Courtesy of Machine Market...
Страница 40: ...Courtesy of Machine Market...
Страница 52: ...Courtesy of Machine Market...
Страница 72: ...Courtesy of Machine Market...
Страница 120: ...Courtesy of Machine Market...
Страница 134: ...Courtesy of Machine Market...
Страница 141: ...Section 190 0000 SM 2282 Rev1 04 04 5 Electrical System Circuit Diagrams SM 3178 Courtesy of Machine Market...
Страница 142: ...Section 190 0000 Electrical System Circuit Diagrams 6 SM 2282 04 04 SM 3178A Courtesy of Machine Market...
Страница 143: ...Section 190 0000 SM 2282 Rev1 04 04 7 Electrical System Circuit Diagrams SM 3178B Courtesy of Machine Market...
Страница 144: ...Section 190 0000 Electrical System Circuit Diagrams 8 SM 2282 04 04 SM 3178C Courtesy of Machine Market...
Страница 145: ...Section 190 0000 SM 2282 Rev1 04 04 9 Electrical System Circuit Diagrams SM 3178D Courtesy of Machine Market...
Страница 146: ...Section 190 0000 Electrical System Circuit Diagrams 10 SM 2282 04 04 SM 3178E Courtesy of Machine Market...
Страница 147: ...Section 190 0000 SM 2282 Rev1 04 04 11 Electrical System Circuit Diagrams SM 3178F Courtesy of Machine Market...
Страница 148: ...Section 190 0000 Electrical System Circuit Diagrams 12 SM 2282 04 04 SM 3178G Courtesy of Machine Market...
Страница 149: ...Section 190 0000 SM 2282 Rev1 04 04 13 Electrical System Circuit Diagrams SM 3178H Courtesy of Machine Market...
Страница 150: ...Section 190 0000 Electrical System Circuit Diagrams 14 SM 2282 04 04 SM 3178I Courtesy of Machine Market...
Страница 151: ...Section 190 0000 SM 2282 Rev1 04 04 15 Electrical System Circuit Diagrams SM 3178J Courtesy of Machine Market...
Страница 152: ...Section 190 0000 Electrical System Circuit Diagrams 16 SM 2282 04 04 SM 3178K Courtesy of Machine Market...
Страница 153: ...Section 190 0000 SM 2282 Rev1 04 04 17 Electrical System Circuit Diagrams SM 3178L Courtesy of Machine Market...
Страница 154: ...Section 190 0000 Electrical System Circuit Diagrams 18 SM 2282 04 04 SM 3178M Courtesy of Machine Market...
Страница 155: ...Section 190 0000 SM 2282 Rev1 04 04 19 Electrical System Circuit Diagrams SM 3178N Courtesy of Machine Market...
Страница 156: ...Courtesy of Machine Market...
Страница 176: ...Courtesy of Machine Market...
Страница 186: ...Courtesy of Machine Market...
Страница 194: ...Courtesy of Machine Market...
Страница 224: ...Courtesy of Machine Market...
Страница 228: ...Courtesy of Machine Market...
Страница 264: ...Courtesy of Machine Market...
Страница 274: ...Courtesy of Machine Market...
Страница 278: ...Courtesy of Machine Market...
Страница 282: ...Courtesy of Machine Market...
Страница 288: ...Courtesy of Machine Market...
Страница 300: ...Courtesy of Machine Market...
Страница 306: ...Courtesy of Machine Market...
Страница 314: ...Courtesy of Machine Market...
Страница 328: ...Courtesy of Machine Market...
Страница 336: ...Courtesy of Machine Market...
Страница 342: ...Courtesy of Machine Market...
Страница 354: ...Courtesy of Machine Market...
Страница 366: ...Courtesy of Machine Market...