5
. Remove bracket that secures the wire harness to
the right side of chassis (fig. 9-1). Move the
harness up and away from the tank.
6.
Disconnect the two tubes from the top of the QA
solenoid block, follow the tubes above the solenoid
and remove the tube camps securing the tubes to
the chassis. Then disconnect wire harness
(fig. 9-2).
7.
Disconnect the pressure tube from the front side of
the QA solenoid block. Follow the tube forward to
the connecting pilot tube (fig. 9-3).
8.
Using one wrench, keep the pilot tube steady to
ensure it does not twist, with another wrench
separate the tubes. Then remove the pressure
tube from the machine (fig. 9-4).
9.
Loosen the hose clamp on bottom of QA solenoid
block to remove the hose. Then remove the two
bolts securing the QA solenoid block to the chassis
and slide to remove (fig. 9-5).
10.
Remove both of the tube clamps from the high and
low flow loader tubes located on the left side of the
chassis, then disconnect the tubes fromthe valve
and fromthe hoses to remove (fig 9-6).
9-6
9-2
Compact Track Loader
9. Hydraulic Reservoir
9-1
9-2
9-3
9-5
Bolt
Bracket
Tubes
Tubes
Wire Harness
9-4
Keep steady
Pressure tube
Содержание PT100G Forestry
Страница 1: ...PT 100G PT 100G Forestry Part Number 2076 286 Printed 8 10 Service Manual Compact Track Loader...
Страница 2: ......
Страница 6: ......
Страница 12: ......
Страница 14: ......
Страница 20: ...Hydraulic Solenoid Blocks Figure 3 6 PT 100G Hyd Solenoid blocks 3 6 Compact Track Loader 3 Circuit Diagrams...
Страница 22: ......
Страница 40: ......
Страница 52: ......
Страница 62: ......
Страница 66: ......
Страница 80: ......
Страница 98: ......
Страница 102: ......
Страница 116: ......
Страница 136: ......
Страница 138: ......
Страница 140: ......
Страница 141: ......
Страница 142: ...Terex Construction Americas 8800 Rostin Road Southaven MS 38671 888 201 6008 662 393 1800 www terex com...