2.9”(128x64) Easy to install and use with graphic LCD.
TCR (SVC) Connectable
Generator Input and Generator Compensation
Remote Communication with Rs485 (Computer Communication)
Compensation for Inductive and Capacitive Systems
Manual Step Value Enterable
Single, Two and Three Phase Capacitor and Shunt Reactor can be connected
Turkish and English Language Option
Voltage, Harmonic Current/Voltage, Inductive and Capacitive Alarm Output
Step Drive, Step Release, Discharge and Settlement Times are Adjustable
Current Harmonics can be Observed Up To 31st Harmonics
Voltage Harmonics can be Observed Up To 31st Harmonics
Cosine Values of Each Phase Can Be Observed
Power Factor Values of Each Phase can be Observed
 Capacitive/Active and Inductive/Active Ratios can be Observed
Total Active and Reactive Energies (Import/Export/Inductive/Capacitive) can be Observed.

THD-V and THD-I values of 

E

ach 

P

hase can be 

Observed. 

Creating Power Analysis

 (20 samples 9999 min.)

It Shows The Total Number of Uses of the Steps.

Encrypted Protection
Same Aging in Steps

1

Features

About RGT-12SVC

    

It is designed to reduce reactive (inductive and capacitive) power that comes from the 

network and loads do not use. If the inductive reactive power is attracted from the network, 

it interferes by attracting 

capacitor

 at the appropriate step. If capacitive reactive power is

attracted from the network, interferes by attracting shunt reactor at the appropriate step. 

Thus it endeavors to reduce the inductive/active and capacitive/active rates of the system.

    

It is designed to make more sensible compensation at the unbalanced inductive and 

capacitive systems with RGT-

12SVC

 TCR(SVC) step. 

What is the SVC (TCR) ?

    SVC is a new generation compensation system that works to minimize the capacitive power in 

the system by activating the reactors connected to the TCR (Thyristor Controlled Reactor) 

unit as much as necessary against the instantaneous capacitive power in the system.

2

While making current transformer test and measurement of the step, be careful about 

avoiding rapid load changing on the system as much as possible.

Compensation starts with the

 

regulations of the load distribution of the Electrical 

wiring

 in a balanced way that belongs to the system.

For the current transformer test, connect three phase capacitors in 1/40 (*) of the current 

transformer value to the first three stages of the device.  ( * : The total value of the first three 

levels.)

Do not define step number and capacitor values randomly where has rapid load changing 

and where huge amount of load is distributed randomly. 
You can get benefit from the examples which are in the Power Analysis, in order to 

compensate more effectively to the unbalanced loads in the system.

While preparing compensation board be careful about that you should easily add new 

steps for probable changings

 

(load adding or excluding) that can occur subsequently.

It is advisable to add new steps at the same value for the lifespan of the commonly used 

step's conductor and c

apacitor

.

Matters to 

b

e Considered 

i

Power Factor Correction

Choose the 

a

utomat

ic

 fuse current values used in steps according to the power of the 

capacitor

 and reactor and point as connection removing member.

Use seperate automatic fuse for each feeding inductor of the step conductors.

Use compensation 

contactors

 and discharge 

inductors at the steps.

Mono

phase connection at the three phase systems is only appropriate for balanced 

load attraction. Otherwise

 

desired rates cannot be obtained.

Warnings

Use the device according to our instructions.
Avoid direct sun light in order not to harm the LCD screen. 
Leave at least 10 cm of space behind the device after mounting.
Fix the device with apparatus which comes within the device by avoiding any kind of 

shake on the front cover of the board.
Balance the inner and outer heat in the metal boards. Otherwise because of the

 

temperature 

difference that originates from the dampish surrounding, water droplets occurs on the ceiling 

of the board and this situation is dangerous for the open connected buses.

Keep the switch and circuit breaker close to the device and easily accessible by the operator.

Mark the switch and circuit breaker as the connection tripping element for the device. 

There must be no electricity in the connection cables when assembling.
Screened and twisted cord cables should be used on the input and output lines without 

connection to the Mains (network). These cables should not pass near high-Voltage lines 

and devices.

Содержание RGT-12SVC

Страница 1: ...ELEKTR K ELEKTRON K SAN T C A www tense com tr www tenseenerji com Banks Hotels Oil Stations Schools Malls Factories Main Usage Areas RGT 12SVC USER MANUAL...

Страница 2: ...e Measurement Screen Inroduction 17 17 Cosinus Page Total Powers Page 17 Ratios Page 17 Voltage and Current Page 18 Instant Powers Page 18 Total Energy Page 18 THD V and THD I page 17 Voltage and Freq...

Страница 3: ...0 31 32 33 34 34 27 28 28 29 Advanced Settings Menu Power Factor Correction Power Analysis Samples ModBus RS485 Communication Settings Operating Power Operating Harmonic Delete Logs Generator Settings...

Страница 4: ...D I values of Each Phase can be Observed Creating Power Analysis 20 samples 9999 min It Shows The Total Number of Uses of the Steps Encrypted Protection Same Aging in Steps 1 Features About RGT 12SVC...

Страница 5: ...ding to the power of the capacitor and reactor and point as connection removing member Use seperate automatic fuse for each feeding inductor of the step conductors Use compensation contactors and disc...

Страница 6: ...ust be in the same order Connect the k l terminals of the current transformer connected to the L1 phase to the k1 l1 terminals the k l terminals of the current transformer connected to the L2 phase to...

Страница 7: ...ter the Current Transformer Value in the system using the UP and DOWN buttons and then press the SET button to save The device will automatically start Current Transformer Test operation In case of an...

Страница 8: ...ing You can check the stored step values on the Step Values screen 2 1 1 in the Step Menu When current transformer test is successful this page will be displayed on the screen If the operation is conf...

Страница 9: ...e screen When the RIGHT button is pressed phase phase voltage values are displayed Figure 5 Phase Neutral voltage and current values are displayed on the screen Figure 6 Instantaneous power values of...

Страница 10: ...ure 4 In this menu you can see Step Values take Step Measurement change Step Time Settings make PFC settings Make Step Control Manually Enter Step Value and set Auto Step Measurement Period Advanced S...

Страница 11: ...ps Harmonic Filter Kondansat r Thermal A2 2A 6A A1 L C1 C2 C3 C4 C5 C6 2A Voltages Input Voltages Output SRL XXT 1 2 3 L1 N in1 in2 Thermal Shunt Reactors Coil Coil Coil Thermal Thermal Thermal in3 L2...

Страница 12: ...instantaneous rate less than 15 If it is low this led will light 4 Buttons They are used to monitor measurements and make adjustments ESC Button When pressed in the menu it returns to the upper menu...

Страница 13: ...een Press the UP button to switch to the Current Transformer Value page While in this page press the SET button to enter the Current Transformer Value in the system Current Transformer Value Entry pag...

Страница 14: ...his page press SET button to enter Current Transformer Menu The Current Transformer Test page will appear on the screen Press the UP button to switch to the Current Transformer Value page CURRENT TRAN...

Страница 15: ...links The device will fix these connections software wise During the step measurement this page will be displayed on the screen all steps will be measured in order and their values will be displayed...

Страница 16: ...The device will fix these connections software wise Current Trans Test Yes No Menu 1 1 1 CURRENT TRANSFORMER TEST Menu 1 1 Enter Password PASS 0000 Three phase capacitor equivalent to 1 40 of current...

Страница 17: ...is used to select all the steps and TCR is used to measure shunt reactors connected to the drive Menu 2 2 1 Measure 01 05 09 02 06 10 03 07 11 TCR ALL 04 08 12 After the selected steps are measured th...

Страница 18: ...6 1 Step Approved Example On the screen above the three phase 10kVAr capacitor value has been entered in the 1st step If the value to be entered is single phase L1 L2 or L3 should be selected from th...

Страница 19: ...button In this page you can navigate between the steps with UP DOWN buttons you can use the RIGHT button to control activate the steps and passive the active steps Active steps are indicated by the si...

Страница 20: ...e password page is displayed for entering the menu When ESC button is pressed Home Page Total Powers is displayed Ratios Ind Cap Instant 0 3 0 2 Hourly 0 3 0 2 Daily 0 3 0 2 Energy 0 3 0 2 ___________...

Страница 21: ...yed When the SET button is pressed the password page is displayed for entering the menu When ESC button is pressed Home Page Total Powers is displayed THD V THD I L1 100 0 L1 100 0 L2 100 0 L2 100 0 L...

Страница 22: ...Connection Learned If the operation is confirmed by pressing the SET button the device will automatically start the Step Measurement process After the test it indicates that the current transformer t...

Страница 23: ...ween the steps with UP DOWN buttons select the steps you want to measure with the RIGHT button and start the measurement process by pressing the SET button The stages selected for the measurement are...

Страница 24: ...steps at once it determines the time to wait between the steps Factory Setting 400msec Setting Range 100msec 3000msec KADEME OLCUMU Menu 2 2 SettingsE Step MenuE PFC Settings PFC SETTINGS Menu 2 4 PFC...

Страница 25: ...he Step Approved notification appear on the screen To exit without saving pressing the ESC button will return to the Manual Step Value Set page Example On the screen above the three phase 10kVAr capac...

Страница 26: ...2 7 1 Settings E Advanced Settings Menu It is the third menu that appears when you proceed by pressing the UP button after entering the settings page In this menu Compensation Target Value can be set...

Страница 27: ...ve powers drawn from each phase are recorded along with their duration capacitive powers are indicated by a sign If the power consumption remains constant over a certain period of time it is recorded...

Страница 28: ...ive Menu 3 4 1 Voltage V Curr A L1 220 0 L1 380 0 L2 220 0 L2 380 0 L3 220 0 L3 380 0 _____________________ ALR Low Voltage It is the fifth of the 8 different setting parameters in the advanced settin...

Страница 29: ...while the Generator Compensation page is on the screen In this page you can navigate between the parameters Control Set and Tolerance with the RIGHT button and change the value in the selected parame...

Страница 30: ...ontact is activated When the alarm mode is passive no warning is given Settings E Advanced Settings Menu E PF Correction Alarm Settings E Device Settings Menu It is the fourth menu that appears when y...

Страница 31: ...he default password value 0000 the new password will need to be entered each time it is desired to enter the Settings menu Settings E Device Settings Menu E Change Password It is the third of 4 differ...

Страница 32: ...the end of the set time It is the last of the 4 different setting parameters in the device settings menu To change the backlight off time press the SET button while the Backlight Settings page is on t...

Страница 33: ...ection Q 4 3 Phase Connection Q 3 2 Phase Connection Bridge Q 3 Capacitor Powers 0 16 KVAR 0 33 KVAR 0 5 KVAR 0 83 KVAR 1 66 KVAR 2 5 KVAR 3 33 KVAR 5 KVAR 6 66 KVAR 8 33 KVAR 10 KVAR 0 16 KVAR 0 33 K...

Страница 34: ...L1 Capacitor kvar Single phase L2 Capacitor kvar Single phase L3 Capacitor kvar Step Value Determination According to Power Analysis Samples Three Phase capacitors have the lowest 0 5kVAr and the hig...

Страница 35: ...99 00 0 1200 Even 1 1 5000 5 30 30 A sec sec 99 99 60 270 210 60 50 50 60 3000 99 00 26 19200 Odd 2 247 sec msec kVAr week bps sec V V sec Set Value Tolerance Value 0 50 1 0 50 10 0 It can be active...

Страница 36: ...33 Dimensions 138mm 147mm 114 5mm 147mm 138mm Back View 147mm Front View 147mm Left Side View 138mm 43mm 22mm Fixing apparatus Screw fixing apparatus 45mm 34mm 6mm 143mm...

Страница 37: ...ccuracy Reactive Power Accuraacy Harmonic Voltage Measuring Range Harmonic Current Measuring Range 100V 300V AC 50 60 Hz 12VA 20 C 55 C 30 C 80 C 90 5mA 5 5A 2 9 128x64 Graphic LCD and LEDs 1 5mm 2 5m...

Страница 38: ...ELEKTR K ELEKTRON K SAN T C A Document Number DK 094 2 Rev 1 10_200317 QUALITY SOLUTIONS MADE IN TURKEY Energy and Compensation Tracking System www tenseenerji com...

Отзывы: