
WorkHorse H-ADCP Operation Manual
May
2015
EAR-Controlled Technology Subject to Restrictions Contained on the Cover Page.
Page 11
>ps0
Instrument S/N: 3192
Frequency: 307200 HZ
Configuration: 3 BEAM, HORIZONTAL
Beam Angle: 25 DEGREES
Beam Pattern: CONVEX
Orientation: UP
Sensor(s): HEADING TILT 1 TILT 2 DEPTH TEMPERATURE
PRESSURE
Pressure Sens Coefficients: (c3,c2,c1,offset) 0.00,0.00,0.01,-1.15
Temp Sens Offset: -0.22 degrees C
CPU Firmware: 11.07 [0]
Boot Code Ver: Required: 1.13 Actual: 1.13
DEMOD #1 Ver: ad48, Type: 1f
DEMOD #2 Ver: ad48, Type: 1f
PWRTIMG Ver: 85d3, Type: 6
Board Serial Number Data:
D1 00 00 00 E6 FD 28 09 PIO727-3013-04X
B4 00 00 00 E7 09 74 09 REC727-1015-04X
34 00 00 00 E6 F8 29 09 CPU727-2000-00H
A9 00 00 02 C9 37 69 09 DSP727-2001-04F
>
At the ">" prompt in the communication window,
enter
PS0
then press the Enter key. This will display the
H-ADCP system configuration data.
>pa
PRE-DEPLOYMENT TESTS
CPU TESTS:
RTC......................................PASS
RAM......................................PASS
ROM......................................PASS
RECORDER TESTS:
PC Card #0...............................NOT DETECTED
Card Detect............................PASS
Communication..........................PASS
DOS Structure..........................PASS
Sector Test (short)....................PASS
PC Card #1...............................NOT DETECTED
DSP TESTS:
Timing RAM...............................PASS
Demod RAM...............................PASS
Demod REG...............................PASS
FIFOs....................................PASS
SYSTEM TESTS:
XILINX Interrupts... IRQ3 IRQ3 IRQ3 ...PASS
Receive Loop-Back........................PASS
Wide Bandwidth...........................PASS
Narrow Bandwidth.........................PASS
RSSI Filter..............................PASS
Transmit.................................PASS
SENSOR TESTS:
H/W Operation............................PASS
>
At the ">" prompt in the communication window,
enter the direct command
PA
then press the Enter key.
This will run the H-ADCP Pre-Deployment tests.
>Pt3
Correlation Magnitude: Narrow Bandwidth
Lag Bm1 Bm2 Bm3
0 255 255 255
1 144 144 146
2 70 71 73
3 37 33 35
4 24 18 18
5 13 12 8
6 6 5 2
7 3 2 1
High Gain RSSI: 71 67 74
Low Gain RSSI: 16 16 18
SIN Duty Cycle: 49 52 49
COS Duty Cycle: 48 50 48
Receive Test Results = $000 ... PASS
>
At the ">" prompt in the communication window,
enter the direct command
PT3
then press the Enter
key. This will run the H-ADCP Receive Path test.