Chapter 3: Installation
The list and diagrams below briefly describe the sequence of actions required to
hookup your system and prepare to gather data. Refer to the specified references for
more information.
CAUTION!
!
At the first sign of condensation on the camera's inlet
and/or outlet pipes, turn off the system. Damage to the
camera as a result of condensation is not covered under
warranty.
Action
Reference(s)
1.
If the system components have not already been
unpacked, unpack them and inspect their carton(s) and
the system components for in-transit damage.
Section 4.1, Unpacking the
System
2.
Verify that all system components have been received.
Section 4.2, Checking the
Equipment and Parts
Inventory
3.
With the ST-133 turned OFF, verify that the appropriate
line voltage and fuses have been installed in the ST-133
controller.
Section 4.4, Verifying
Controller Voltage Setting
4.
If using WinView/32 software to control your system,
install that software if it has not already been installed.
Refer to the WinView/32
manual.
5.
If the USB 2.0 interface card is not already installed in the
host computer, install it.
Section 4.6, Configuring the
USB 2.0 Interface
, on page 32
6.
With the computer and ST-133 both OFF, connect the
interface cable to the Controller and the interface card in
the host computer. Then tighten down the locking
hardware.
Section 4.7, Connecting the
Interface
(Controller-Computer) Cable
on page 34
7.
The PI-MTE camera (designed for use in a vacuum) is
shipped with a visible nose in place so you can initially set
up the camera for operation outside of a vacuum
chamber.
, on page 41 steps you
through verification of the camera's operation while it is
outside of the chamber. You can also practice using the
software before changing the camera nose for vacuum
chamber operation.
• Proceed to step 8 to prepare the camera for vacuum
operation.
• Proceed to step 9 for non-vacuum operation.
, on
Содержание Princeton Instruments PI-MTE
Страница 1: ...www princetoninstruments com PI MTE System Manual 4411 0097 Issue 6 October 1 2019...
Страница 22: ...22 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 25: ...Chapter 3 Installation 25 PI MTE System Diagram 4411 0097_0014...
Страница 26: ...26 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 58: ...58 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 66: ...66 PI MTE System Manual Issue 6 Figure 6 8 Flow Chart Safe Mode versus Fast Mode 4411 0097_0032...
Страница 90: ...90 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 94: ...94 PI MTE System Manual Issue 6 Figure B 2 PI MTE Camera 8 01 05 and later 4411 0097_0054...
Страница 95: ...Appendix B Outline Drawings 95 Figure B 3 PI MTE Camera 8 01 05 and earlier 4411 0097_0055...
Страница 102: ...102 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 112: ...112 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 117: ...This page is intentionally blank...