24
PI-MTE System Manual
Issue 6
8.
Skip this step for non-vacuum operation. If the camera is
to be operated in a vacuum chamber, first replace the
visible nose with the open nose in a clean room
environment. Then, mount the camera in the vacuum
chamber.
Appendix D, Visible to Open
Nose Change Instructions
9.
Make the tubing connections between the coolant
circulator and the camera. If the camera is being operated
in vacuum, additional tubing connections to the
intermediate vacuum flange will be required.
Section 4.11, Make the
Coolant Connections
, on
Appendix C, VCR and
Swagelok Fittings
10. With the ST-133 power turned
OFF
, connect the male end
of the camera cable to the
Detector
port on the rear of
the ST-133. Connect the female end of the cable to the
connector on the vacuum flange (vacuum operation) or to
the rear of the PI-MTE camera (non-vacuum operation).
Secure both ends of the cable.
Section 4.8, Connect the
Detector-Controller Cable:
Non-Vacuum Applications
,
on page 35
Section 7.13, Secure the
Detector-Controller Cable
Slide Latch
11. If the camera is being operated in vacuum, the additional
vacuum-compatible cable will be required. This cable is
very fragile so handle it with care when mounting it to the
vacuum flange and the back of the camera. Secure the
cable at both ends.
Section 4.9, Connect the
Detector-Controller Cable:
Vacuum Applications
, on
Section 7.13, Secure the
Detector-Controller Cable
Slide Latch
12. Skip this step for non-vacuum operation. Secure and
evacuate the vacuum chamber.
13. Turn on the ST-133.
14. Turn on the computer and begin running the application
software.
Refer to the WinView/32
manual.
15. Enter the hardware setup information.
Refer to the WinView/32
manual.
16. Turn on the coolant circulator. The recommended flow
rate is 2 liters/minute.
17. Set the target array temperature.
,
18. When the system reaches temperature lock, begin
acquiring data in focus mode.
Action
Reference(s)
Содержание Princeton Instruments PI-MTE
Страница 1: ...www princetoninstruments com PI MTE System Manual 4411 0097 Issue 6 October 1 2019...
Страница 22: ...22 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 25: ...Chapter 3 Installation 25 PI MTE System Diagram 4411 0097_0014...
Страница 26: ...26 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 58: ...58 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 66: ...66 PI MTE System Manual Issue 6 Figure 6 8 Flow Chart Safe Mode versus Fast Mode 4411 0097_0032...
Страница 90: ...90 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 94: ...94 PI MTE System Manual Issue 6 Figure B 2 PI MTE Camera 8 01 05 and later 4411 0097_0054...
Страница 95: ...Appendix B Outline Drawings 95 Figure B 3 PI MTE Camera 8 01 05 and earlier 4411 0097_0055...
Страница 102: ...102 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 112: ...112 PI MTE System Manual Issue 6 This page is intentionally blank...
Страница 117: ...This page is intentionally blank...