6 – Operating Procedure
DPN 402196 Issue 4.1
© Teledyne TSS
6- 9
13. With the ROV in the water, check again for correct waveforms from the SEP using the SDC
oscilloscope function, and for correct data strings from the altimeter.
Background and Seawater (Active) Compensation Monitoring
14. Perform a background compensation procedure at the start of the dive with the ROV on the
seabed. It is common for the background characteristics of the ROV to change during the first
20 minutes of deployment, possibly due to thermal effects. Survey measurements made during
this period may include errors caused by such changes in ROV characteristics. Repeat the
background compensation procedure 30 minutes after you deploy the ROV. Create a hard
copy of the results and attach it to the survey records.
15. Perform regular background and seawater compensation checks during the survey to ensure
that no changes or shifts have occurred. Use the internal logging facility to record these
checks.
16. Perform a Background Noise Profile check. To perform a Noise Profile of the surveying vicinity,
steer the ROV away from the target to a distance of approximately 10 metres. At this position
check that all the signal voltages fall to zero ±5µV. If any signal voltage is greater than 5µV at a
distance of 10 metres from the target, repeat the full background compensation procedure.
Use the Noise Profile logging facility to record the signals present during the test. If all signals
are close to zero, return to the target and continue the survey.
17. Check the Seawater compensation. Lift the vehicle to 3m off the seabed. The target voltages
should be less than 10µV. If they vary, check the water temperature is set correctly. If good
rejection cannot be obtained then consider using Manual Compensation.
NOTE
A “Flick” in the target voltages occurs at approx. 4m above the seabed, this is not
a fault in the 440 System or its configuration.
Data Logging
18. Log all survey data including the regular background compensation, seawater compensation
checks and Background Noise Profile check.
19. Maintain a written record of any events that occur during the survey (for example a collision
between the ROV and debris, etc.). Describe any corrective actions taken.
20. To assist post-survey analysis a Background Noise Profile should be carried out after a Back-
ground Compensation. This facility allows a log to be generated of background noise in the
surveying vicinity that could affect the quality of the survey data obtained. See section 7.3.5
Background Noise Profile.
End of Survey
21. Print another copy of the System configuration and retain it with the survey records.
22. Wash the sub-sea installation carefully using a fresh-water hose to remove all deposits of salt
and debris. Check the sub-sea installation visually for signs of damage or corrosion. Repair
any damage to the equipment before you stow the ROV.
Содержание 440
Страница 12: ...List of Figures x Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 16: ...Revision History xiv Teledyne TSS DPN 402196 Issue 4 1 1 0 Feb 19 2003 First Issue Issue No Date Details ...
Страница 18: ...Glossary xvi Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 24: ...1 Introduction 1 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 32: ...2 System Overview 2 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 66: ...4 Electrical Installation 4 20 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 88: ...5 Operating Software 5 22 Teledyne TSS DPN 402196 Issue 4 1 Figure 5 10 Altimeter Test ...
Страница 144: ...6 Operating Procedure 6 40 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 154: ...7 Operational Considerations 7 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 164: ...8 System Specifications 8 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 203: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 17 Figure 10 15 SDC10 Dimensions ...
Страница 204: ...10 System Drawings 10 18 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 16 400604 1 Power Supply Chassis Assembly ...
Страница 205: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 19 Figure 10 17 400667 1 Main Chassis Assembly ...
Страница 206: ...10 System Drawings 10 20 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 18 400667 2 Main Chassis Assembly ...
Страница 209: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 23 Figure 10 21 400654 1 PSU Filter Assembly ...
Страница 210: ...10 System Drawings 10 24 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 22 490232 1 Processor Pod Assembly ...
Страница 211: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 25 Figure 10 23 490228 1 Power Supply Pod Assembly 110v version ...
Страница 212: ...10 System Drawings 10 26 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 24 500045 1 Coil Mounting Frame ...
Страница 213: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 27 Figure 10 25 B930892 1 Coil Assembly ...
Страница 214: ...10 System Drawings 10 28 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 26 601004 1 Coil Cable Assembly ...
Страница 215: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 29 Figure 10 27 B930473 1 PSU to ROV PWR COMMS Cable 3 0m ...
Страница 230: ...A Operating Theory A 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 242: ...B Options B 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 244: ...C Altimeter C 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 246: ...D Reference D 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 248: ...D Reference D 4 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 250: ...D Reference D 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 252: ...D Reference D 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 254: ...D Reference D 10 Teledyne TSS DPN 402196 Issue 4 1 ...