
6 – Operating Procedure
DPN 402196 Issue 4.1
© Teledyne TSS
6- 5
WARNING
There have been reports of pressure building up within the Sub-sea unit if water
has been able to seep into the housing. Take great care when opening the SEP
unit.
6.2.1.2 Coil Installation
❐
Electrical characteristics
.
Check the coil continuity and insulation resistance. Do not use coils that fail the insulation test.
See
section 6.3.2.1 "Coil Insulation Test" on page 6-13
.
❐
Coil configuration
.
Install the coils so that there is a 5-10mm gap between the port and starboard coils and the
centre coil lies flat on top (see
section Figure 3-6: "Assembly of the coil frame" on page 3-10
and
). Align the coils so that their connectors all face towards the ROV.
❐
Coil separation distance
.
Allow sufficient distance between the coil array and the vehicle body so that the background
signal (with no target) is less than 1000µV for standard coil values and below 7500µV for early
coil values. Usually this requires a coil separation distance of between 0.75m and 1.0m,
depending on the size of the ROV.
❐
Coil mounting
.
Make certain the coils are mounted rigidly on the ROV. If the ROV uses a system that lowers
the coil array to its normal operating position after deployment, make certain this locks into the
correct position before you start the first background compensation procedure. See
6.2.2.3 "Background Compensation" on page 6-22
for a description of background compensa-
tion.
CAUTION
Never drill holes in the coils. It will result in the coils be unusable.
You may install the coils either at the front or the rear of the ROV. If you use a rear mounting
position, arrange a subsea camera to check that the umbilical does not drag near the coils and
create a false target.
❐
Coil height
.
For a small target
– Install the coils low on the ROV to extend the detection range as deeply
as possible into the seabed. Operate the ROV carefully to avoid collisions between the coils
and debris on the seabed.
For a large target
– Install the coils higher on the ROV to reduce the likelihood of coil saturation.
This position also provides better protection for the coils.
❐
Cables
.
Use plastic cable ties to secure the cables to the ROV frame. Make certain the cables cannot
move providing a false target during survey operations.
Содержание 440
Страница 12: ...List of Figures x Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 16: ...Revision History xiv Teledyne TSS DPN 402196 Issue 4 1 1 0 Feb 19 2003 First Issue Issue No Date Details ...
Страница 18: ...Glossary xvi Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 24: ...1 Introduction 1 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 32: ...2 System Overview 2 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 66: ...4 Electrical Installation 4 20 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 88: ...5 Operating Software 5 22 Teledyne TSS DPN 402196 Issue 4 1 Figure 5 10 Altimeter Test ...
Страница 144: ...6 Operating Procedure 6 40 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 154: ...7 Operational Considerations 7 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 164: ...8 System Specifications 8 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 203: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 17 Figure 10 15 SDC10 Dimensions ...
Страница 204: ...10 System Drawings 10 18 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 16 400604 1 Power Supply Chassis Assembly ...
Страница 205: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 19 Figure 10 17 400667 1 Main Chassis Assembly ...
Страница 206: ...10 System Drawings 10 20 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 18 400667 2 Main Chassis Assembly ...
Страница 209: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 23 Figure 10 21 400654 1 PSU Filter Assembly ...
Страница 210: ...10 System Drawings 10 24 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 22 490232 1 Processor Pod Assembly ...
Страница 211: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 25 Figure 10 23 490228 1 Power Supply Pod Assembly 110v version ...
Страница 212: ...10 System Drawings 10 26 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 24 500045 1 Coil Mounting Frame ...
Страница 213: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 27 Figure 10 25 B930892 1 Coil Assembly ...
Страница 214: ...10 System Drawings 10 28 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 26 601004 1 Coil Cable Assembly ...
Страница 215: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 29 Figure 10 27 B930473 1 PSU to ROV PWR COMMS Cable 3 0m ...
Страница 230: ...A Operating Theory A 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 242: ...B Options B 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 244: ...C Altimeter C 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 246: ...D Reference D 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 248: ...D Reference D 4 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 250: ...D Reference D 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 252: ...D Reference D 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 254: ...D Reference D 10 Teledyne TSS DPN 402196 Issue 4 1 ...