6 – Operating Procedure
6-8
© Teledyne TSS
DPN 402196 Issue 4.1
❐
Check that you have connected the coil cables in the correct sequence (Starboard to Channel
1, etc.).
❐
At the SDC ensure that you have attached all necessary connections from the SEP/PSU, the
data logger, the altimeter, the video system and the printer as required.
❐
Check that you have installed and secured the SDC safely so that it will not move or fall with
movements of the survey vessel.
❐
Check and connect a noise-free power supply of the correct voltage to the SDC.
❐
Check the power supply connection from the ROV to the PSU. The standard PSU accepts AC
electrical power at a nominal supply voltage 110V.
❐
Set the correct format for external data logging.
❐
Set the RS232 parameters of the SDC ‘COM2’ and ‘LOG O/P’ (COM3) ports to match any
equipment connected to them.
❐
If you are using a current-loop communication method, check on the SDC to see whether the
‘C/LOOP’ LED shows green when you power-on the sub-sea installation. Select the Run Dis-
play screen and check that it updates correctly. Use the SDC oscilloscope display to check for
correct waveforms on all channels.
Operations Check List
Installation
1.
Check that you have installed the 440 System correctly.
2.
Set the internal clock of the SDC to the correct date and time.
Establishing the Start-of-Survey Configuration
3.
Set the target scaling factor to the correct value.
4.
Set the correct altimeter parameters, including any vertical offset measurements.
5.
Set the threshold according to requirements.
6.
Check that coil mapping correctly matches the specific installation.
7.
Set the background compensation reminder interval.
8.
Upon completion of 3 – 8 above, backup the configuration to the SDC hard disk.
9.
Print the configuration and retain a copy with the survey records.
Pre-dive Checks
10. Power-on the 440 System thirty minutes before you deploy the ROV. If practical, perform a tar-
get detection test.
11. Use the SDC oscilloscope display and check for correct waveforms on all channels.
12. If your System has an altimeter fitted, perform an Altimeter Test and check that the System
receives data strings from the altimeter.
Содержание 440
Страница 12: ...List of Figures x Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 16: ...Revision History xiv Teledyne TSS DPN 402196 Issue 4 1 1 0 Feb 19 2003 First Issue Issue No Date Details ...
Страница 18: ...Glossary xvi Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 24: ...1 Introduction 1 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 32: ...2 System Overview 2 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 66: ...4 Electrical Installation 4 20 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 88: ...5 Operating Software 5 22 Teledyne TSS DPN 402196 Issue 4 1 Figure 5 10 Altimeter Test ...
Страница 144: ...6 Operating Procedure 6 40 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 154: ...7 Operational Considerations 7 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 164: ...8 System Specifications 8 10 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 203: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 17 Figure 10 15 SDC10 Dimensions ...
Страница 204: ...10 System Drawings 10 18 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 16 400604 1 Power Supply Chassis Assembly ...
Страница 205: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 19 Figure 10 17 400667 1 Main Chassis Assembly ...
Страница 206: ...10 System Drawings 10 20 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 18 400667 2 Main Chassis Assembly ...
Страница 209: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 23 Figure 10 21 400654 1 PSU Filter Assembly ...
Страница 210: ...10 System Drawings 10 24 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 22 490232 1 Processor Pod Assembly ...
Страница 211: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 25 Figure 10 23 490228 1 Power Supply Pod Assembly 110v version ...
Страница 212: ...10 System Drawings 10 26 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 24 500045 1 Coil Mounting Frame ...
Страница 213: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 27 Figure 10 25 B930892 1 Coil Assembly ...
Страница 214: ...10 System Drawings 10 28 Teledyne TSS DPN 402196 Issue 4 1 Figure 10 26 601004 1 Coil Cable Assembly ...
Страница 215: ...10 System Drawings DPN 402196 Issue 4 1 Teledyne TSS 10 29 Figure 10 27 B930473 1 PSU to ROV PWR COMMS Cable 3 0m ...
Страница 230: ...A Operating Theory A 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 242: ...B Options B 12 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 244: ...C Altimeter C 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 246: ...D Reference D 2 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 248: ...D Reference D 4 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 250: ...D Reference D 6 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 252: ...D Reference D 8 Teledyne TSS DPN 402196 Issue 4 1 ...
Страница 254: ...D Reference D 10 Teledyne TSS DPN 402196 Issue 4 1 ...