3200 Series Standalone and 3200 Series 1+1 System Installation Guide
4
1.2
Installation Prerequisites
For the installation to proceed without interruption, it is important that you verify that you have all
necessary materials on hand.
3200 Series Standalone
3200 Series 1+1 System
Adequate space for the installation of the
3200 Series Standalone.
You will need to mount the 3200 series unit on a
19" equipment rack (customer provided). Your
3200 series unit is a 1U unit.
Adequate space for the installation of your
3200 Series 1+1 system.
You will need to mount the 3200 series 1+1
system on a 19" equipment rack (customer
provided).
Your 1+1 System requires space for the
following number of units:
Adequate power supply and power
connections.
The 3200 series unit requires two power
connections to provide for its redundant power
supply.
To guarantee an uninterrupted supply of
electricity, each power connection must be fed
by a dedicated power source.
An IP address for the management port.
To avoid delays, you should have the IP address,
netmask and gateway addresses on hand. Take
note that the management port supports DHCP,
see
Series Gateway Management Interface” on
page
15 for further information.
3200 Series Unit:
3200 1 Unit:
1+1 Patch Panel:
Total:
1U
1U
1U or 2U
a
3U or 4U
b
a. 1U per 1+1 patch panel, 2U if two patch panels are required
b. Depending on whether your system required 1 or 2 patch panels. Refer to
Adequate power supply and power
connections.
The 3200 series and 3200 1 units
require two power connections each, as they are
equipped with redundant power supplies. To
guarantee an uninterrupted supply, each power
connection must be fed by a dedicated power
source.
An IP address for the management port.
To avoid delays, you should have the IP
address, netmask and gateway addresses on
hand. Take note that the management port
supports DHCP, see Section
to the 3200 Series 1+1 System Management
Interfaces” on page