Section 3: Setting up SMUs in Clarius
Model 4200A-SCS Source-Measure Unit (SMU) User's Manual
3-8
4200A-SMU-900-01 Rev. A December 2020
Run a simple test
When you select Run, selected tests and actions at a lower level than the highlighted item in the
project tree are executed, from top to bottom in the project tree. If you want to run an entire project,
make sure the project name is highlighted. Running a project saves the configuration settings and the
existing run history of the project.
In the following example, when you select
Run
, the following occurs:
•
The
vce-ic
test runs.
•
The
gummel
test runs.
•
The
vcsat
test is skipped.
•
The
vds-id
test runs.
Figure 34: Run a test at the project level