Section 7: Make I-V measurements on a solar cell
Model 4200A-SCS Source-Measure Unit (SMU) User's Manual
7-6
4200A-SMU-900-01 Rev. A December 2020
Configure the test
To configure the test:
1. In the project tree, select the
fwd-ivsweep
solar cell I-V test in the project tree.
2. Select
Configure
.
Figure 111: Configure highlighted
3. Adjust the Anode settings as needed.
Figure 112: Key Parameters pane for the I-V sweep of a solar cell