Operating Instructions—442 Service
2. Surround the instrument with polyethylene sheet
ing to protect the finish and prevent packing material from
entering the instrument.
3. Cushion the instrument on all sides by tightly
packing dunnage or urethane foam between carton and
instrument, allowing three inches on all sides.
4. Seal carton with shipping tape or industrial stapler.
Required Reshipment Information
If the instrument is to be shipped to a Tektronix Service
Center for service or repair, attach a tag containing the
following information:
1. Owner’s name and address, with the name of an
individual at your firm who can be contacted.
2. Complete instrument serial number.
3. Description of the services required.
2-18
R E V A M A Y 1980
Содержание 442
Страница 9: ...442 Service 442 Oscilloscope viii REV A MAY 1980 ...
Страница 113: ...Figure 7 4 442 Oscilloscope block diagram REV A JUN 1980 2 3 7 4 2 7 A ...
Страница 117: ...A8 VERTICAL BOARD Figure 7 6 Vertical circuit board location ...
Страница 118: ......
Страница 120: ......
Страница 122: ......
Страница 123: ...Figure 7 8 interface circuit board location ...
Страница 124: ......
Страница 126: ......
Страница 130: ...A ll TRIGGER SWITCH BOARD 2 3 7 4 3 6 A Figure 7 10 Trigger Switch circuit board location ...
Страница 131: ...2 3 7 4 S 4 R ev jun VRSO V E R T IC A L OUT PUT CRT t PROBE ADJ 3 ...
Страница 133: ......
Страница 137: ......
Страница 139: ......
Страница 140: ...4 4 Z ...
Страница 142: ......
Страница 145: ...A14 HORIZONTAL OUTPUT BOARD 2 3 7 4 4 0 A Figure 7 14 Horizontal Output circuit board locations ...
Страница 148: ...R EV K JUN 9SO ...
Страница 153: ... 442 ...
Страница 154: ...442 REV A DEC 1978 ...
Страница 164: ......