AALTO CONTROL WMU USER GUIDE
VOT97, Rev 1.1, 1.3.2017
17
4.
Tap PREVIEW to create the list.
5.
If you wish to export the list, insert a USB drive and tap EXPORT HISTORY TO CSV FILE button.
Select a file you wish to export the list to, or tap SELECT without selecting a file to create a new
file.
2. 8.
Using Prohibitions tab to create test schedules (REPORTS view)
Test prohibition (only for selected Teknoware luminaire models)
With the Test prohibition tool you can set up time periods, during which the luminaires are not
allowed to run tests.
To add a Test Prohibition Rule:
1.
Create a Luminaires List to REPORTS view, as described in
Chapter 2. 2
.
2.
Go to Prohibitions tab, and tap the ADD RULE
button.
3.
Type a name for the prohibition rule. Set up the time period on which you want to prohibit
luminaire self testing. Select whether you want the Prohibition time to affect all tests, or only
duration tests. Tap the SAVE button.
4.
A Prohibition Rule is now created.
5.
You can modify the Prohibition Rule by selecting a Rule, and clicking the EDIT RULE button. To
remove a Rule from the system, select a Rule and click the REMOVE RULE button.
6.
To apply this Prohibition Rule, select luminaire(s) from the Luminaires list, and tap the APPLY
button. Selected luminaires can be removed from a prohibition rule with the REMOVE button.
NOTE!
Modifying a Prohibition Rule WILL affect all the luminaires
using the said prohibition time rule!