Tekmar D 270 Скачать руководство пользователя страница 14

© 2010          D 270 - 08/10 

14 of 24 

5

6

115 V (ac)

L

N

Power

L

N

1

2

Boil

Dem

Com

Dem

24 to 230 V (ac)

N

L

2

3

Com

Dem

DHW

Dem

24 to 230 V (ac)

N

L

L

115 V (ac)

N

Prim

P1

Power

L

6

N

4 5

7 8

M

24 to 230 V (ac)

DHW

Pmp/Vlv

or

N

L

STEP FOUR 

  

ELECTRICAL CONNECTIONS TO THE CONTROL

General

The installer should test to confirm that no voltage is present at any of the wires. Push the control into the base and slide it down 
until it snaps firmly into place.

 Powered Input Connections

115 V (ac) Power

Connect the 115 V (ac) power supply to the 

Power L

 and 

Power N

 terminals (5 and 6). 

This connection provides power to the microprocessor and display of the control. 
As well, this connection provides power to the 

Prim P1

 terminal (4) from the 

Power L

 

terminal (5).

Boiler Demand

To generate a 

Boiler Demand

, a voltage between 24 V (ac) and 230 V (ac) must be 

applied across the 

Boil Dem 

and 

Com Dem

 terminals (1 and 2).

DHW Demand

To generate a 

DHW Demand

, a voltage between 24 V (ac) and 230 V (ac) must be 

applied across the 

Com Dem

 and 

DHW Dem

 terminals (2 and 3).

Caution:

 The same power supply must be used to power both the DHW Demand and 

the Boiler Demand circuits since they both share the 

Com Dem

 terminal.

Output Connections

Primary Pump Contact (Prim P1)

The 

Prim P1

 output terminal (4) is a powered output. When the relay in the control 

closes, 115 V (ac) is provided to the 

Prim P1

 terminal (4) from the 

Power L

 terminal (5). 

To operate the primary pump, connect one side of the primary pump circuit to terminal 4 
and the second side of the pump circuit to the neutral (

Power

 

N

) side of the 115 V (ac) 

power supply.

DHW Pmp / Vlv Contact

The 

DHW  Pmp / Vlv

 terminals (7 and 8) are an isolated output. There is no power 

available on these terminals from the control. These terminals are to be used as a 
switch to either make or break power to the DHW pump or the DHW valve. Since this 
is an isolated contact, it may switch a voltage between 24 V (ac) and 230 V (ac).

Boiler Pmp P2 Contact

The 

Boiler Pmp P2 

terminals (9 and 10) are isolated output in the control. There is no 

power available on these terminals from the control. These terminals are to be used 
as a switch to either make or break power to a boiler pump. Since this is an isolated 
contact, it may switch a voltage between 24

 

V

 

(ac) and 230

 

V

 

(ac).

10

9

24 to 230 V (ac)

L

N

Boiler

Pmp P2

Содержание D 270

Страница 1: ...Indr UnO Boil Com Sw Boiler Control 270 One Modulating Boiler DHW Boiler Pmp P2 DHW Pmp Vlv H2039A Menu Item Boiler Demand DHW Demand Modulation DHW Priority Override Test o not testing red testing r...

Страница 2: ...sh buttons Menu Item for selecting and adjusting settings As you program your control record your settings in the ADJUST menu table which is found in the second half of this brochure Menu All of the i...

Страница 3: ...gs Burner Displays when Relay 1 is turned on Warning Displays when an error exists or when a limit has been reached Pump Displays when the primary or boiler pump is operating Lock Unlock Displays when...

Страница 4: ...m The supply water temperature is based on outdoor reset or a fixed temperature for DHW Outdoor Reset When a boiler demand signal from the heating system is present the control operates the boiler s t...

Страница 5: ...calculates a boiler target temperature that is below the Boiler Minimum setting the boiler target temperature is adjusted to at least the Boiler Minimum setting During this condition if the boiler is...

Страница 6: ...ut signal range of the 270 control The Minimum Modulation setting limits the control output range in order to match the boiler s input range To calculate the Minimum Modulation use the following formu...

Страница 7: ...residential cast iron boilers or steel tube boilers The Med Mass setting provides a moderate response to the heating system Hi 3 The Hi setting is selected if the boiler that is used has a high therm...

Страница 8: ...of time that the primary pump continues to run is adjustable using the Primary Pump Purge setting The primary pump continues to run until either the purging time has elapsed or the boiler supply temp...

Страница 9: ...ight periods INDOOR SENSOR With the indoor sensor connected the control is able to sense the actual room temperature Indoor temperature feedback fine tunes the supply water temperature in the heating...

Страница 10: ...on the WWSD pointer in the display When the control is in WWSD the Boiler Demand pointer is displayed if there is a boiler demand However the control does not operate the heating system to satisfy thi...

Страница 11: ...contact is opened until the heating system has recovered before returning to DHW operation This mode can be used if a DHW tank is piped in direct return and a DHW valve is installed DHW MODE 4 Extern...

Страница 12: ...heat from the boiler into the DHW tank The control continues this purge for a maximum of four minutes or until the boiler supply water temperature drops 20 F 11 C below the boiler target temperature d...

Страница 13: ...or Sensor 070 One Universal Sensor 082 Data Brochures D 270 D 070 D 001 Application Brochure A 270 Note Carefully read the details of the Sequence of Operation to ensure that you have chosen the prope...

Страница 14: ...power supply must be used to power both the DHW Demand and the Boiler Demand circuits since they both share the Com Dem terminal Output Connections Primary Pump Contact Prim P1 The Prim P1 output term...

Страница 15: ...When these two terminals are shorted together the control registers an unoccupied UNOCC signal Connection to Operate Modulating Boiler 11 12 Mod V dc V dc STEP FIVE TESTING THE WIRING General Each ter...

Страница 16: ...e wiring between the terminal block and pump and refer to any installation or troubleshooting information supplied with the pump If the pump operates properly disconnect the power and remove the jumpe...

Страница 17: ...oth with water and wring out prior to wiping control Do not use solvents or cleaning solutions DIP Switch Settings GENERAL The DIP switch settings on the control are very important and should be set t...

Страница 18: ...measured by the boiler supply sensor 22 to 266 F 30 to 130 C Boiler Target Boiler target temperature is the temperature the control is currently trying to maintain at the boiler supply sensor of the...

Страница 19: ...F 82 C B1 Boiler Minimum The minimum allowed boiler target temperature Check the boiler manufacturer s manual for a recommended setting OFF 80 to 180 F OFF 27 to 82 C Default 140 F 60 C B1 Boiler Maxi...

Страница 20: ...C Default 180 F 82 C DHW Exchange Unoccupied Selects whether or not a DHW demand will be responded to during the UnOccupied period OFF On Default OFF WWSD Occupied The system s warm weather shut down...

Страница 21: ...essed again to advance to the next step This can also be used to rapidly advance through the test sequence To reach the desired step repeatedly press and release the Test button until the appropriate...

Страница 22: ...ystem start up in order to purge air from the piping To enable the Max Heat feature use the following procedure 1 Press and hold the Test button for more than 3 seconds At this point the control flash...

Страница 23: ...to read the boiler supply sensor due to a short circuit The control will not operate the boiler until the sensor is repaired Locate and repair the problem as described in the Data Brochure D 070 To cl...

Страница 24: ...AND FITNESS FOR A PARTICULAR PURPOSE DURA BILITY OR DESCRIPTION OF THE PRODUCT ITS NON INFRINGEMENT OF ANY RELEVANT PATENTS OR TRADEMARKS AND ITS COMPLIANCE WITH OR NON VIOLATION OF ANY APPLICABLE EN...

Отзывы: