DHW MODE 4 OPERATION

In DHW MODE 4, the space heating zones must be prevented from coming on during DHW demands using external wiring. This 
can be done using an external relay to remove power from zone pumps or zone valves while a DHW Demand is present. This 
external relay is interlocked with the 

DHW Pmp / Vlv

 contact.

During a DHW Demand, the control closes the primary pump (

Prim

 

P1

) contact and the 

DHW Pmp / Vlv

 contact. Once the DHW 

Demand is removed, or during a DHW priority override, the 

DHW Pmp / Vlv

 contact is opened, and the external wiring should allow 

the space heating zones to operate.

There is no mixing purge available in DHW MODE 4. After DHW priority, the boiler supply water temperature may exceed the design 
water temperature of the space heating system and can result in damage to the heating system.

Installation

 CAUTION

Improper installation and operation of this control could result in damage to the equipment and possibly even personal injury. It is 
your responsibility to ensure that this control is safely installed according to all applicable codes and standards. This electronic 
control is not intended for uses as a primary limit control. Other controls that are intended and certified as safety limits must be 
placed into the control circuit. Do not open the control. Refer to qualified personnel for servicing. Opening voids warranty and could 
result in damage to the equipment and possibly even personal injury.

STEP ONE 

  

GETTING READY

Check the contents of this package. If any of the contents listed are missing or damaged, please contact your wholesaler or tekmar 
sales representative for assistance.

Type 270 includes: One Boiler Control 270, One Outdoor Sensor 070, One Universal Sensor 082, Data Brochures D 270, D 070, 
D 001, Application Brochure A 270.

Note:

 Carefully read the details of the Sequence of Operation to ensure that you have chosen the proper control for your application.

STEP TWO 

  

MOUNTING THE BASE

Remove the control from its base by pressing down on the release clip in the wiring chamber and sliding the control away from it. 
The base is then mounted in accordance with the instructions in the Data Brochure D 001.

 STEP THREE 

  

ROUGH-IN WIRING

All electrical wiring terminates in the control base wiring chamber. The base has standard 

7 8

 in (22 mm) knockouts, which accept 

common wiring hardware and conduit fittings. Before removing the knockouts, check the wiring diagram and select those sections 
of the chamber with common voltages. Do not allow the wiring to cross between sections, as the wires will interfere with safety 
dividers which should be installed at a later time.

Power must not be applied to any of the wires during the rough-in wiring stage.

  All wires are to be stripped to a length of 

3 8

 in (9 mm) to ensure proper connection to the control.

  Install the Outdoor Sensor 070 according to the installation instructions in the Data Brochure D 070 and run the wiring back to   

 the 

control.

  Install the Boiler Supply Sensor 082 according to the installation instructions in the Data Brochure D 070 and run the wiring    

  back to the control.

  If an Indoor Sensor 076 or 077 is used, install the indoor sensor according to the instructions in the Data Brochure D 074 and    

  run the wiring back to the control.

  Run wire from other system components (pumps, boiler, etc.) to the control.

  Run wires from the 115 V (ac) power to the control. Use a clean power source with a 15 A circuit to ensure proper operation.  

   Multi-strand 16 AWG wire is recommended for all 115 V (ac) wiring due to its superior flexibility and ease of installation into   
 the 

terminals.

Содержание D 270

Страница 1: ...Indr UnO Boil Com Sw Boiler Control 270 One Modulating Boiler DHW Boiler Pmp P2 DHW Pmp Vlv H2039A Menu Item Boiler Demand DHW Demand Modulation DHW Priority Override Test o not testing red testing r...

Страница 2: ...sh buttons Menu Item for selecting and adjusting settings As you program your control record your settings in the ADJUST menu table which is found in the second half of this brochure Menu All of the i...

Страница 3: ...gs Burner Displays when Relay 1 is turned on Warning Displays when an error exists or when a limit has been reached Pump Displays when the primary or boiler pump is operating Lock Unlock Displays when...

Страница 4: ...m The supply water temperature is based on outdoor reset or a fixed temperature for DHW Outdoor Reset When a boiler demand signal from the heating system is present the control operates the boiler s t...

Страница 5: ...calculates a boiler target temperature that is below the Boiler Minimum setting the boiler target temperature is adjusted to at least the Boiler Minimum setting During this condition if the boiler is...

Страница 6: ...ut signal range of the 270 control The Minimum Modulation setting limits the control output range in order to match the boiler s input range To calculate the Minimum Modulation use the following formu...

Страница 7: ...residential cast iron boilers or steel tube boilers The Med Mass setting provides a moderate response to the heating system Hi 3 The Hi setting is selected if the boiler that is used has a high therm...

Страница 8: ...of time that the primary pump continues to run is adjustable using the Primary Pump Purge setting The primary pump continues to run until either the purging time has elapsed or the boiler supply temp...

Страница 9: ...ight periods INDOOR SENSOR With the indoor sensor connected the control is able to sense the actual room temperature Indoor temperature feedback fine tunes the supply water temperature in the heating...

Страница 10: ...on the WWSD pointer in the display When the control is in WWSD the Boiler Demand pointer is displayed if there is a boiler demand However the control does not operate the heating system to satisfy thi...

Страница 11: ...contact is opened until the heating system has recovered before returning to DHW operation This mode can be used if a DHW tank is piped in direct return and a DHW valve is installed DHW MODE 4 Extern...

Страница 12: ...heat from the boiler into the DHW tank The control continues this purge for a maximum of four minutes or until the boiler supply water temperature drops 20 F 11 C below the boiler target temperature d...

Страница 13: ...or Sensor 070 One Universal Sensor 082 Data Brochures D 270 D 070 D 001 Application Brochure A 270 Note Carefully read the details of the Sequence of Operation to ensure that you have chosen the prope...

Страница 14: ...power supply must be used to power both the DHW Demand and the Boiler Demand circuits since they both share the Com Dem terminal Output Connections Primary Pump Contact Prim P1 The Prim P1 output term...

Страница 15: ...When these two terminals are shorted together the control registers an unoccupied UNOCC signal Connection to Operate Modulating Boiler 11 12 Mod V dc V dc STEP FIVE TESTING THE WIRING General Each ter...

Страница 16: ...e wiring between the terminal block and pump and refer to any installation or troubleshooting information supplied with the pump If the pump operates properly disconnect the power and remove the jumpe...

Страница 17: ...oth with water and wring out prior to wiping control Do not use solvents or cleaning solutions DIP Switch Settings GENERAL The DIP switch settings on the control are very important and should be set t...

Страница 18: ...measured by the boiler supply sensor 22 to 266 F 30 to 130 C Boiler Target Boiler target temperature is the temperature the control is currently trying to maintain at the boiler supply sensor of the...

Страница 19: ...F 82 C B1 Boiler Minimum The minimum allowed boiler target temperature Check the boiler manufacturer s manual for a recommended setting OFF 80 to 180 F OFF 27 to 82 C Default 140 F 60 C B1 Boiler Maxi...

Страница 20: ...C Default 180 F 82 C DHW Exchange Unoccupied Selects whether or not a DHW demand will be responded to during the UnOccupied period OFF On Default OFF WWSD Occupied The system s warm weather shut down...

Страница 21: ...essed again to advance to the next step This can also be used to rapidly advance through the test sequence To reach the desired step repeatedly press and release the Test button until the appropriate...

Страница 22: ...ystem start up in order to purge air from the piping To enable the Max Heat feature use the following procedure 1 Press and hold the Test button for more than 3 seconds At this point the control flash...

Страница 23: ...to read the boiler supply sensor due to a short circuit The control will not operate the boiler until the sensor is repaired Locate and repair the problem as described in the Data Brochure D 070 To cl...

Страница 24: ...AND FITNESS FOR A PARTICULAR PURPOSE DURA BILITY OR DESCRIPTION OF THE PRODUCT ITS NON INFRINGEMENT OF ANY RELEVANT PATENTS OR TRADEMARKS AND ITS COMPLIANCE WITH OR NON VIOLATION OF ANY APPLICABLE EN...