BA_ECO-Cube_190815_EN.docx
3
15.08.2019
16.2.2
Visual inspection of the pipelines for dust deposits
32
16.2.3
Visual inspection of the pneumatic pipes
33
16.2.4
Functional test of the unit
33
16.2.5
Electrical test of the electrical lines and earthing connections
34