background image

   

 

Page 2-3

 

10 TEGAM WAY • GENEVA, OHIO 44041 • 440-466-6100 • FAX 440-466-6110 • [email protected]

 

PREPARATION FOR USE AND INSTALLATION 

 

Use only Alkaline or Manganese D Cells that have been 

proven by a Nationally Recognized Testing Laboratory to 

meet the requirements of UL60079-11, section 10.5.2.  Use 

of any other battery will invalidate the Type certificate and 

will create a hazardous condition.  The only  batteries that 

TEGAM has secured such testing on, and which are approved 

for use in the R1L-E2A are listed on the Type Certificate and 

are: 

o

 

Energizer E95 

 

Reinstall the battery access panel and tighten the six captive 

screws to secure it. 

 

If the test probes are to be used, connect their leads to the 

corresponding color-coded binding post on the R1L-E2A front 

panel, as shown in figure 2a and 2b. Only HTP-101A or SKP-8 

test probes or leads may be used in an explosive atmosphere. 

Ensure they are properly connected for a four-wire 

measurement. For example, if measuring the value of a low 

value resistor, connect the +I and –I current leads to the ends 

of the resistor leads away from the resistor body. Connect the 

+E  and  –E leads between the current leads and the resistor 

body at the points between which the resistance value is to be 

determined, making sure the +E lead is on the same side of 

the resistor as the +I lead, and the –E lead is on the same side 

of the resistor as the –I lead.

 

 

 

 

 

 

 

 

 

 

Содержание R1L-E2A

Страница 1: ...R MODEL R1L E2A Instruction Manual PN R1L E2A 900 01 Publication Date March 2020 REV G An Agency Related Document Those sections identified as controlled cannot be changed without approval of the Noti...

Страница 2: ...nt manufactures Do not mix fresh batteries with old batteries WARNING To reduce the risk of ignition of a flammable or explosive atmosphere batteries must be changed only in a location known to be non...

Страница 3: ...s AVERTISSEMENT Pour r duire le risque d allumage d une atmosph re inflammable ou explosive les piles doivent tre chang es seulement dans une zone connue pour tre non dangereuse AVERTISSEMENT Quand op...

Страница 4: ...nt 1 2 Figure 1 Front Panel and Controls 1 5 List of Items Furnished 1 6 Storage and Shipping Requirements 1 6 2 PREPARATION FOR USE AND INSTALLATION Unpacking and Inspection 2 1 Preparation for Use 2...

Страница 5: ...value digitally on a liquid crystal display LCD The R1L E2A cycles the current ON and OFF during the measurement During the OFF state thermal and offset voltages occurring in the voltage measurement c...

Страница 6: ...anel The removable battery access cover also has a gasket The front panel is aluminum with durable polycarbonate graphical overlay The lid of the R1L E2A case further serves as a storage area for the...

Страница 7: ...lect the desired resistance range for the resistance under test There are five ranges marked 2 m 20 m 200 m 2 and 20 Note that although the ranges are marked 2 etc the actual reading limit is 1 999 m...

Страница 8: ...t probes HTP 101A and or a pair of Kelvin Probes SKP 8 The probes are color coded a red one for use with the left hand and a white one for use with the right hand Each probe is attached to an eight fo...

Страница 9: ...Page 1 5 10 TEGAM WAY GENEVA OHIO 44041 440 466 6100 FAX 440 466 6110 sales tegam com INSTRUMENT DESCRIPTION Figure 1 Front Panel and Controls...

Страница 10: ...ordered 1 set of Pistol shaped Test Probes HTP 101A and or 1 set of Kelvin Probes SKP 8 1 5 Storage and Shipping Requirements Storage Temperature 40 C to 71 C Relative humidity 0 to 100 non condensing...

Страница 11: ...pen the lid Since the lid is well gasketed it may be difficult to open if there is an appreciable difference between external and internal air pressure Check for the presence of two test probes stored...

Страница 12: ...and install the three D cells in the battery holder When installing the cells rotate them slightly to ensure connection to the battery holder contacts The cells are connected in series for a nominal...

Страница 13: ...d tighten the six captive screws to secure it If the test probes are to be used connect their leads to the corresponding color coded binding post on the R1L E2A front panel as shown in figure 2a and 2...

Страница 14: ...Page 2 4 10 TEGAM WAY GENEVA OHIO 44041 440 466 6100 FAX 440 466 6110 sales tegam com PREPARATION FOR USE AND INSTALLATION Figure 2a HTP 101A Probe Connections...

Страница 15: ...Page 2 5 10 TEGAM WAY GENEVA OHIO 44041 440 466 6100 FAX 440 466 6110 sales tegam com PREPARATION FOR USE AND INSTALLATION Figure 2b SKP 8 Probe Connections...

Страница 16: ...half bright depressing the switch again will turn the backlight on to maximum brightness and depressing the switch a third time will turn the backlight OFF Whenever power to the R1L E2A is turned OFF...

Страница 17: ...len to a value near the end of its useful life LOBAT will be seen on the display The unit will not be damaged by further use but this is a warning that readings may not be accurate especially on the 2...

Страница 18: ...o address the particular service request by you which is assigned to that RMA number Of even greater importance a detailed written description of the problem should be attached to the instrument Many...

Страница 19: ...ssing and repair process RMA Instrument Model Serial Number Company Technical Contact Phone Number Additional Contact Info Repair Instructions Evaluation Calibration Only Repair Only Repair Calibratio...

Страница 20: ...ill recalibrate any product which does not conform to the published accuracy specifications In order to exercise this warranty TEGAM Inc must be notified of the defective product before the expiration...

Страница 21: ...special or consequential damages Purchaser s sole and exclusive remedy in the event any item fails to comply with the foregoing express warranty of TEGAM shall be to return the item to TEGAM shipping...

Отзывы: