51
1. Loose tightening nut on cable clamp in order to place AC cable through as shown in Figure 4-8.
Figure 4-8: Loose Tightening Screw
2. Insert the AC wires into the AC input connector UKH as shown in Figure 4-9.
3. Tighten the connector UKH50/95/240 screws:
4. Input Connection for 30KW 3P208/480, 45KW 3P480, 60KW 3P480 System Models: tightening
torque: 65~70 lbf-in. (7.3-8.5Nm).
5. Input Connection for 45KW 3P208 System Models: tightening torque: 165~177 lbf-in. (18.5-20Nm).
6. Input Connection for 60KW 3P208 System Models: tightening torque: 250~265 lbf-in. (28.3-30Nm).
7. Tighten the cable clamp's screw nuts.
Figure 4-9: AC Wire Inserted Through and Fixed to the AC Connector
Содержание GBSPS10-3000
Страница 2: ...This page intentionally left blank ...
Страница 6: ...This page intentionally left blank ...
Страница 32: ...26 This page intentionally left blank ...
Страница 49: ...43 Power System Optional Earth Ground Connection ...
Страница 50: ...44 Power System Side View and Output Bus bars Dimensions All Dimensions are in mm ...